OCTAGON CONCRETE SOLUTIONS INC is listed as a company organization in Philippine public procurement records on this site, with 69 linked DPWH project(s) totaling about ₱6,691,690,625.00. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
OCTAGON CONCRETE SOLUTIONS INC
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 69
- Total value
- ₱6,691,690,625.00
- Published flags
- 0
- Region
- Region VIII · Region VIII
Public Record Grade
A transparent, data-derived summary of reported public records for OCTAGON CONCRETE SOLUTIONS INC — not an accusation or finding of wrongdoing.
Score: 75.40 / 100 · Projects in sample: 69 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 55.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 55.1
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 47
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 69
- pastTargetOngoingProjects
- 19
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 69
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 69
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 69
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 69
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 61 geotagged projects (largest by contract value) — Open full map
- LOCAL PROGRAM (LP) - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF TACLOBAN AIRPORT PASSENGER TERMINAL BUILDING PHASE 3, TACLOBAN CITY24I00327 · ₱964,280,240.24 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONST. OF AIRPORT FACILITY, BUSUANGA AIRPORT, CORON, PALAWAN24E00146 · ₱400,945,606.40 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RDS./S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF R0AD, BRGY. LIYANG, PILAR TO BRGY. BILOLO, ORION, BATAAN (PACKAGE 1)23C00105 · ₱192,998,227.12 · mapped
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE K0115+949 TO K0118+000, ROXAS, PALAWAN18E00024 · ₱162,446,440.59 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM LEFTSIDE), ABORLAN, PALAWAN24E00131 · ₱154,397,265.51 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM RIGHTIDE), ABORLAN, PALAWAN24E00130 · ₱147,107,907.99 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS, CONCRETE REBLOCKING, 280MM THICK W/ ASPHALT OVERLAY, 50MM THICK ALONG DAANG MAHARLIKA (LT), KO972+000-KO990+000, SECTION ID: S00166LT, BAYBAY LEYTE, 5TH DISTRICT15I00070 · ₱146,248,421.21 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE FACILITIES INCLUDING SITE DEVELOPMENT, SAN FERNANDO, LA UNION (RE-ADVERTISEMENT)25AE0070 · ₱144,044,907.29 · mapped
- PAVING OF UNPAVED ROADS-PALAWAN CIRCUM. ROAD, KO232+764-KO232+900; KO233+090-KO236+098; KO236+417-KO236+694; KO211+625-KO212+089; KO212+257-KO212+312, RIZAL, PALAWAN18E00029 · ₱143,366,421.42 · mapped
- ROAD UPGRADING OF PALAWAN CIRCUMFERENTIAL ROAD K0224+503 - K0224+660; K0224+800-K0228+656, RIZAL, PALAWAN17E00037 · ₱143,309,373.17 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) PALAWAN CIRCUMFERENTIAL ROAD, KO228+656.00 - KO232+764.00; KO233+025.00 - KO233+090.00, RIZAL, PALAWAN17E00038 · ₱143,307,635.85 · mapped
- PAVING OF UNPAVED ROADS - QUEZON PUNTA BAJA ROAD, KO193+049-KO196+320; KO196+457-KO196+976; KO197+352-KO197+580, QUEZON, PALAWAN18E00032 · ₱143,280,414.71 · mapped
- RETROFITTING OF COA MAINBUILDING NOS. 1 AND 223O00080 · ₱142,988,094.81 · mapped
- CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 2, CARMONA CITY, CAVITE24D00198 · ₱142,578,748.61 · mapped
- CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 1, CARMONA CITY, CAVITE24D00197 · ₱142,578,745.39 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL ROAD, K1117+100 - K1117+390, LEYTE 4TH LD21I00072 · ₱140,932,450.41 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD - K1069+300 - K1069+440, PALOMPON, LEYTE21I00061 · ₱137,368,610.01 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL RD. - K1116+782 - K1116+900, ISABEL, LEYTE21I00062 · ₱137,368,523.51 · mapped
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE K0101+200 TO K0101+737; K0102+492 TO K0103+572, ROXAS, PALAWAN18E00021 · ₱128,021,966.70 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, PRIMARY ROADS, DAANG MAHARLIKA, K0565+638.50-K0565+811, K0565+845-K0567+330, K0567+351-K0569+384, K0569+414-K0570+079, SORSOGON18F00008 · ₱120,593,209.78 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINT. - SECONDARY ROADS, ORMOC - BAYBAY - SOUTHERN LEYTE BDRY. RD., K1113+170 - K1118+000 (S00197LT), LEYTE 5TH LD19I00007 · ₱119,038,653.51 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PALOMPON - ISABEL - MERIDA - ORMOC ROAD - K1069+(-050) - K1069+200, LEYTE 4TH LD21I00071 · ₱112,745,945.25 · mapped
- ROAD WIDENING - AKLAN WEST RD (KALIBO - NABAS) K0238+662 - K0240+500, K0240+680 - K0240+929, K0242+200 - K0243+49018G00036 · ₱102,603,289.22 · mapped
- CONSTRUCTION OF ROAD, 0+000.00 - 1+240.00, BARANGAY BACUNGAN, PUERTO PRINCESA CITY, PALAWAN25EG0020 · ₱99,295,000.00 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BATO-BONTOC ROAD K1123+040 - K1128+91320IL0075 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LAMORO BRIDGE III, EL NIDO, PALAWAN25EE0052 · ₱96,099,899.50 · mapped
- ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS ALONG PALO - CARIGARA - ORMOC ROAD, K0996+335 - K0998+91618IF0086 · ₱94,452,173.69 · mapped
- ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS ALONG PALOMPON - ISABEL - MERIDA - ORMOC ROAD, K1119+349 - K1124+100018IF0087 · ₱94,255,921.62 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS, ORMOC - BAYBAY SO. LEYTE BDRY. ROAD, K1017+840-K1018+334, K1018+459.05-K1019+422, K1019+429-K1020+042, K1020+125.09-K1021+484, K1021+535-K1021+892, K1021+911-K1022+373, K1022+411-K1022+99220IF0015 · ₱91,674,540.73 · mapped
- PREVENTIVE MAINTENANCE- PRIMARY ROADS, ORMOC- BAYBAY SOUTHERN LEYTE BDRY. ROAD, K1014+541-K1015+503,K1015+612-K1016+314,K1016+327-K1017+201,K1017+247-K1017+84020IF0092 · ₱91,674,461.25 · mapped
- PREVENTIVE MAINTENANCE- PRIMARY ROADS, PALO- CARIGARA- ORMOC ROAD K0990+972-K0990+996,K1002+1181-K1003+719,K1003+726-K1004+478,K1004+483-K1004+694,K1004+717-K1005+380,K1005+1040-K1007+00020IF0091 · ₱91,674,299.68 · mapped
- PREVENTIVE MAINTENANCE: ASPHALT OVERLAY, DAANG MAHARLIKA (LT), KO898+(-178) - KO899+462, KO900+000 - KO900+568, KO903+853 - KO905+108, KO905+108 - KO906+505, TACLOBAN CITY18I00035 · ₱88,383,806.73 · mapped
- CONSTRUCTION OF SLOPE PROTECTION AT THE NEWLY BUILT CORON SPORTS COMPLEX, CORON, PALAWAN25EE0058 · ₱78,057,810.41 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS-ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, HINLAYAGAN ILAYA TO B24HC0099 · ₱77,199,990.36 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, HINLAYAGAN ILAYA TO B24HC0080 · ₱77,199,969.54 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BARANGAY SAN JOSE, IN24HC0082 · ₱77,125,000.00 · mapped
- ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON RD., K1030+317-K1034+240TABANGO, LEYTE19IE0072 · ₱73,339,738.79 · mapped
- CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE I, DAVAO DE ORO21L00021 · ₱72,635,044.80 · mapped
- CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE K, DAVAO DE ORO21L00023 · ₱68,211,493.50 · mapped
- CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE J, DAVAO DE ORO21L00022 · ₱68,188,179.68 · mapped
- CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE L, DAVAO DE ORO21L00024 · ₱68,070,796.50 · mapped
- CONCRETE RECONSTRUCTION OF PALO-CARIGARA-ORMOC ROAD, INCLUDING DRAINAGE, KO972+220 - KO972+500; KO972+740 - KO974+722, CAPOOCAN, LEYTE15I00069 · ₱61,352,448.96 · mapped
- CONSTRUCTION / IMPROVEMENT OF ACCESS ROAD LEADING TO TOURISM DESTINATIONS, CONCRETING BRGY. RIZAL NATIONAL HIGHWAY, TAMBIS CAVE, PALOMPON, LEYTE16I00071 · ₱59,511,852.14
- ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS ALONG LIBUNGAO-MATAG-OB-PALOMPON ROAD, K0992+000-K0995+580.5;K0999+000-K1002+65817IF0078 · ₱59,397,393.60 · mapped
- CONSTRUCTION OF MAHAYAG FLOOD CONTROL, BARANGAY MAHAYAG, ALBUERA, LEYTE16I00026 · ₱54,963,838.15
- ROAD UPGRADING (UNPAVED TO PAVED) ALONG CABUNGA-AN - TABUNOK - CONSUEGRA ROAD, K1026+3882 - K1026+5901, SECTION ID: S00079LT, VILLABA, LEYTE15I00061 · ₱48,738,248.12 · mapped
- ASPHALT OVERLAY AT DAANG MAHARLIKA (LT) K1004+(-031.00)-K1007+357.00 SOGOD, SOUTHERN LEYTE17IL0057 · ₱47,807,324.50 · mapped
- PREVENTIVE MAINTENANCE- ASPHALT OVERLAY, PALO-CARIGARA-ORMOC ROAD, K0986+700-K0987+478, K0987+559-K0988+008, K0990+996-K0991+66120IF0084 · ₱46,549,736.55 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE- PRIMARY ROADS-ORMOC-BAYBAY-SOUTHERN LEYTE BRDY. ROAD - K1038+000-K1038+805, K1041+200-1041+422, K1042+385-K1042+445, K1043+120-K1043+809, K1043+838-K1044+870, K1046+835-K1047+147, K1047+824-K1048+091, K19IG0013 · ₱45,986,500.00 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT -4 (HDM-4) SECONDARY VILLABA - PALOMPON ROAD, S00159LT, K1060+469 - K1065+33517IF0026 · ₱40,590,795.20 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
