RNN CONST CORP FORMERLY RNN CONSTRU is listed as a company organization in Philippine public procurement records on this site, with 87 linked DPWH project(s) totaling about ₱1,598,664,811.27. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
RNN CONST CORP FORMERLY RNN CONSTRU
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 87
- Total value
- ₱1,598,664,811.27
- Published flags
- 1
- Region
- Metro Manila 2nd DEO · National Capital Region
Online presence
Google Maps: RNN Construction CorporationGoogle Maps, 2026-10-22
5044 Filmore St, Palanan, Makati City, 1200 Metro Manila
Public Record Grade
A transparent, data-derived summary of reported public records for RNN CONST CORP FORMERLY RNN CONSTRU — not an accusation or finding of wrongdoing.
Score: 83.50 / 100 · Projects in sample: 87 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 71.7/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 71.7
- lateCompletedProjects
- 16
- onTimeCompletedProjects
- 58
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 83
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 93.1/100 · Weight: 21%
- totalProjects
- 87
- componentScore
- 93.1
- terminatedProjects
- 2
- terminationRatePct
- 2.3
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 85
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.7/100 · Weight: 11%
- projects
- 87
- componentScore
- 99.7
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 87
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 69 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- REHABILITATION OF FLOOD CONTROL STRUCTURE, VILLANUEVA CREEK TRIBUTARY (LAGOON) (PHASE 2), BARANGAY B.F. HOMES,PARAÑAQUE CITY, METRO MANILA25OC0069 · ₱92,157,170.32 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAPANG BUWAYA CREEK (PHASE 2), BARANGAY SAN ANTONIO,PARAÑAQUE CITY, METRO MANILA25OC0019 · ₱91,677,458.06 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGUNA DE BAY, BARANGAY SUCAT, MUNTINLUPA CITY24OI0034 · ₱76,062,551.16 · mapped
- CONSTRUCTION OF REVETMENT WALL ALONG DON GALO RIVER FROM RODRIGUEZ TO MULTINATIONAL AVE. (PHASE 3),PARAÑAQUE CITY, METRO MANILA25OC0048 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF REVETMENT WALL ALONG MOONWALK CREEK NEAR AIRPORT VILLAGE (PHASE 2), BARANGAY MOONWALK,PARAÑAQUE CITY, METRO MANILA25OC0068 · ₱48,472,574.20 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE, VILLANUEVA CREEK TRIBUTARY (LAGOON)(PHASE 3), BARANGAY B.F. HOMES,PARAÑAQUE CITY, METRO MANILA25OC0144 · ₱48,019,779.06 · mapped
- BANK IMPROVEMENT/SHEET PILING OF PARAÑAQUE RIVER DIVERSION CHANNELPARAÑAQUE CITY, METRO MANILA17OC0078 · ₱47,030,261.07
- REHABILITATION OF FLOOD MITIGATION STRUCTURE AT DON BOSCO CREEK (PHASE 2) DISTRICT 2,PARAÑAQUE CITY, METRO MANILA25OC0070 · ₱43,893,856.56 · mapped
- CONSTRUCTION OF COVERED LINED CANAL ALONG PNR SITE FROM MAGDAONG RIVER TO TUNASAN RIVER, MUNTINLUPA16OI0061 · ₱41,937,112.66
- Construction of Revetment at Villanueva Creek, Barangay BF Homes, District 2, Parañaque City24OC0104 · ₱29,399,812.65 · mapped
- Construction of Revetment Wall of Villanueva Creek Tributary from Aguirre to Filipinas Ave., Barangay B.F. Homes, Parañaque City (Phase II)24OC0018 · ₱29,397,318.91 · mapped
- Rehabilitation of Slope Protection of Sapang Buwaya Creek near Annex 31 Subd., Brgy. Marcelo Green (Phase 3), Parañaque City21OC0045 · ₱29,397,313.67 · mapped
- Construction of Revetment Wall along Moonwalk Creek near Airport Village, Barangay Moonwalk, Parañaque City24OC0030 · ₱29,394,774.79 · mapped
- Rehabilitation of Flood Control Structure, Villanueva Creek Tributary (Lagoon), Barangay B.F. Homes, Parañaque City, Metro Manila24OC0045 · ₱29,391,551.65 · mapped
- Construction of Revetment at Villanueva Creek Tributary Near Manila Memorial Park, District 2, Parañaque City24OC0107 · ₱29,365,844.46 · mapped
- Construction of Revetment at Don Galo River - Moonwalk Creek Junction Phase 2, District 2, Parañaque City24OC0106 · ₱29,155,410.96 · mapped
- CONSTRUCTION (IMPROVEMENT) OF DON GALO RIVER FROM ALDRIN GOING RODRIGUEZ BRIDGE (PHASE 3), BARANGAY MOONWALKPARAÑAQUE CITY, METRO MANILA25OC0140 · ₱28,811,768.32 · mapped
- CONSTRUCTION OF REVETMENT WALL ALONG PINOS CREEK, BRGY. PINAGKAISAHAN,MAKATI CITY, METRO MANILA24OC0056 · ₱28,223,302.90 · mapped
- CONSTRUCTION OF REVETMENT WALL ALONG MAKATI-PATEROS RIVER, BARANGAY EAST REMBO,MAKATI CITY, METRO MANILA19OC0101 · ₱28,215,261.85 · mapped
- REHABILITATION OF SLOPE PROTECTION OF SAPANG BUWAYA CREEK (NEAR JESTRA VILLAS), BARANGAY SAN ANTONIO,PARAÑAQUE CITY, METRO MANILA19OC0073 · ₱27,900,600.00 · mapped
- CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF BALOC BALOC CREEK,PARAÑAQUE CITY, METRO MANILA20OC0055 · ₱27,900,600.00 · mapped
- REHABILITATION OF SLOPE PROTECTION OF MOONWALK CREEK ARMSTRONG TO BALARAW, PHASE 1, BRGY. MOONWALKPARAÑAQUE CITY, METRO MANILA20OC0063 · ₱27,780,222.29 · mapped
- CONSTRUCTION/IMPROVEMENT OF ROAD, NHA SOUTHVILLE 3, POBLACION, MUNTINLUPA CITY19OI0037 · ₱24,499,997.99 · mapped
- CONSTRUCTION OF ROAD INCLUDING DRAINAGE SYSTEM PHASE 2 GOING TO PAMANTASAN NG LUNGSOD NG MUNTINLUPA, MUNTINLUPA CITY19OI0090 · ₱24,498,342.72 · mapped
- CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF BALIUAG CREEK (PHASE 2),PARAÑAQUE CITY, METRO MANILA20OC0084 · ₱23,250,500.00 · mapped
- REHABILITATION OF MCKINLEY ROAD FROM EDSA TO MAKATI-TAGUIG BOUNDARY (INTERMITTENT SECTION),MAKATI CITY, METRO MANILA21OC0134 · ₱20,394,780.00 · mapped
- CONSTRUCTION OF LINK ROAD, SOUTHVILLE 3, POBLACION,MUNTINLUPA CITY19OI0031 · ₱19,599,999.13 · mapped
- Rehabilitation of Slope Protection, Moonwalk Creek Tributary, Parañaque City21OC0155 · ₱19,599,792.93 · mapped
- Rehabilitation of Slope Protection of Sapang Buwaya Creek near Annex 31 Subd., Brgy. Marcelo Green (Phase 1), Parañaque City21OC0044 · ₱19,598,319.74 · mapped
- Rehabilitation of Slope Protection, Balaraw Creek (Phase III), Parañaque City21OC0040 · ₱19,594,378.86 · mapped
- REHABILITATION OF SLOPE PROTECTION OF MOONWALK CREEK ARMSTRONG TO BALARAW, PHASE II, BRGY. MOONWALKPARAÑAQUE CITY, METRO MANILA20OC0064 · ₱19,537,252.73 · mapped
- CONSTRUCTION OF REVETMENT WALL ALONG MAKATI-PATEROS RIVER (NORTH SIDE), BARANGAY COMEMBO,MAKATI CITY, METRO MANILA19OC0100 · ₱18,810,130.80 · mapped
- CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF MOONWALK CREEK FROM ARMSTRONG TO SOUTHGREEN, BRGY. MOONWALK,PARAÑAQUE CITY, METRO MANILA20OC0057 · ₱18,600,400.00 · mapped
- IMPROVEMENT/SHEET PILING OF VILLANUEVA CREEK, BRGY. B.F. SECTION, DISTRICT II,PARAÑAQUE CITY, METRO MANILA19OC0105 · ₱18,593,539.09 · mapped
- Rehabilitation of Slope Protection of Sapang Buwaya Creek near Annex 31 Subd., Brgy. Marcelo Green (Phase 2), Parañaque City21OC0041 · ₱17,626,280.00 · mapped
- CONSTRUCTION OF BIAZON ROAD INCLUDING DRAINAGE SYSTEM, BRGY. POBLACION, MUNTINLUPA CITY18OI0153 · ₱14,521,390.96 · mapped
- REHABILITATION OF DRAINAGE SYSTEM WITHIN BETTER LIVING SUBDIVISION, BRGY. DON BOSCO,PARAÑAQUE CITY, METRO MANILA25OC0086 · ₱14,405,320.41 · mapped
- UPGRADING OF ROAD/DRAINAGE SYSTEM ALONG SAUDI ARABIA ST., BRGY. DON BOSCO,PARAÑAQUE CITY, METRO MANILA18OC0082 · ₱14,395,747.49 · mapped
- IMPROVEMENT/SHEETPILING OF SAPANG BUWAYA CREEK, BARANGAY SAN ANTONIO, DISTRICT II,PARAÑAQUE CITY, METRO MANILA19OC0104 · ₱13,979,700.00 · mapped
- IMPROVEMENT OF BALOC-BALOC CREEK PARAÑAQUE CITY, METRO MANILA18OC0081 · ₱13,966,506.97 · mapped
- IMPROVEMENT/SHEETPILING OF BALIUAG CREEK, BRGY. MOONWALK, DISTRICT II,PARAÑAQUE CITY, METRO MANILA19OC0102 · ₱13,949,414.87 · mapped
- REHABILITATION/CLEANING AND DESILTING OF MILITARY CREEK, BARANGAY MOONWALK,PARAÑAQUE CITY, METRO MANILA18OC0069 · ₱13,818,176.21 · mapped
- IMPROVEMENT OF BALIUAG CREEK MOONWALK SECTION, PARAÑAQUE CITY, METRO MANILA18OC0077 · ₱13,817,955.43 · mapped
- CONSTRUCTION OF MPB AT BRGY. BATASAN HILLS, Q.C.16OF0171 · ₱13,097,600.00
- REHABILITATION OF ROAD INCLUDING DRAINAGE, PULANGLUPA 2, LAS PINAS CITY LONE DISTRICT25OI0072 · ₱12,613,157.07 · mapped
- PREVENTIVE MAINTENANCE ALONG ZAPOTE - ALABANG - K0023+(-615) - K0023+(-426.53), MUNTINLUPA CITY22OI0125 · ₱11,520,268.07 · mapped
- PREVENTIVE MAINTENANCE SECONDARY ROAD: ZAPOTE-ALABANG ROAD Y-LENGTH (S03272LZ) CH.O - CH. 200.00, MUNTINLUPA CITY22OI0003 · ₱11,520,142.59 · mapped
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE -TERTIARY ROADS-SOUTH SUPER H-WAY WEST SERVICE ROAD-K0014+(-107)-K0014+000, K0014+(-298)-K0014+(-107), K0014+(-404)-K0014+(-298), K0014+(-690)-K0014+(-404), PARAÑAQUE CITY, METRO MANILA24OC0022 · ₱11,499,284.94 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM ALONG ORCHID ST., ROAD 5, ZINNIA ST., CADENA DE AMOR ST., WALING-WALING ST., BARANGAY MARCELO GREEN,PARAÑAQUE CITY, METRO MANILA17OC0091 · ₱10,818,037.44
- REHABILITATION/CLEANING AND DESILTING OF VILLANUEVA CREEK TRIBUTARY (FROM J. ELIZALDE TO RAMONA TIRONA), BARANGAY B. F.,PARAÑAQUE CITY, METRO MANILA18OC0159 · ₱10,809,746.51 · mapped
Equipment & capacity
PCAB license
- License no.
- 24880
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Apr 30, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 24880); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; average final rating 95.7% over 1 rated project; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 29, 2024 | DPWH | ₱29,397,319.00 | Completed | 94.6% | 95.7% | 39th (rev), p. 185 |
| May 22, 2024 | DPWH | ₱28,517,963.00 | On-going | 96.5% | — | 38th, p. 210 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →