R D INTERIOR JUNIOR CONST is listed as a company organization in Philippine public procurement records on this site, with 48 linked DPWH project(s) totaling about ₱9,433,001,367.26. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
R D INTERIOR JUNIOR CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 48
- Total value
- ₱9,433,001,367.26
- Published flags
- 0
- Region
- Region II · Region II
Online presence
Google Maps: R.D. Interior Junior Construction★ 3 (2 reviews)Google Maps, 2026-10-22
Tuguegarao City, Cagayan, Philippines
Public Record Grade
A transparent, data-derived summary of reported public records for R D INTERIOR JUNIOR CONST — not an accusation or finding of wrongdoing.
Score: 81.40 / 100 · Projects in sample: 48 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 71.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 71.6
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 34
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 45
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 48
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 95.8/100 · Weight: 24%
- avgOverrunPct
- 0.5
- componentScore
- 95.8
- projectsWithAbcAndCost
- 48
- projectsOver110PctOfAbc
- 1
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 48
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 48
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
44 geotagged projects — Open full map · Download projects (CSV)
- SUB-PROJECT 8, PARANG EAST DIVERSION ROAD, STA. 0+000 - STA. 7+074.2924Z00009 · ₱1,378,888,883.81
- OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEV'T - CONST'N OF MISSING LINKS/NEW ROADS: JCT. DELFIN ALBANO ROAD, INCLUDING BRIDGE (CANSAN-BAGUTARI BRIDGE), ISABELA, ISABELA 1ST DISTRICT18B00055 · ₱714,000,461.66 · mapped
- BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON CONTRACT PACKAGE 1B16Z00009 · ₱690,413,838.91 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS ROAD, PACKAGE 2, ISABELA (GOV. DY BRIDGE)20B00028 · ₱579,200,527.22 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, PROVINCES OF CAGAYAN AND ISABELA23B00080 · ₱415,350,452.31 · mapped
- CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 27, DAVAO CITY20L00164 · ₱380,119,156.10 · mapped
- CONSTRUCTION OF PINGUIAMAN BRIDGE II ALONG DULAWAN-MARBEL ROAD, K1744+200 TO K1745+168, EXCEPTION K1744+400+K1745+500 (BRIDGE), LAMBAYONG, SULTAN KUDARAT16M00039 · ₱362,019,331.54 · mapped
- WIDENING (2 INTO 4 LANES) OF MANIKI BRIDGE (B00182MN) & APPROACHES ALONG TAGUM-PANABO CIRC. RD INCL18L00093 · ₱332,816,851.62 · mapped
- REHAB/RECONST/UPGRADING OF DAMAGED PAVED CALAPAN SOUTH RD., OR. MINDORO,K0103+000-K0103+594, K0107+(1016)16E00032 · ₱316,577,056.22 · mapped
- CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - IMPROVEMENT/REBLOCKING OF BONGAO - NALIL NATIONAL ROAD, BONGAO18J00130 · ₱312,343,988.07 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - CLAVERIA VIADUCT ALONG MAHARLIKA NORTH RD25B00029 · ₱282,757,606.91 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/STRENGTHENING: CABAGAN - STA. MARIA BRIDGE (B03236LZ) ALONG CABAGAN -STA. MARIA ROAD23B00040 · ₱274,806,456.62 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, CONSTRUCTION OF NEW PERMANENT BRIDGES, SICAPO BRIDGE ALONG APAYAO - ILOCOS NORTE ROAD17P00055 · ₱237,703,833.61
- CONST'N OF CABAGAN-STA.MARIA BRIDGE ALONG CABAGAN-STA.MARIA RD. (COMPLETION), PROVINCE OF ISABELA15B00062 · ₱236,444,228.05 · mapped
- CP 3A - NA : CONSTRUCTION / IMPROVEMENT ALONG ISABELA - LAMITAN SECTION, STA. 00 + 000.00 TO STA. 27 + 300.00 (WITH EXCEPTIONS)16J00089 · ₱234,324,201.65 · mapped
- CONCRETING OF BUAN-PARANG SECTION TRNDP, TAWI TAWI, STA.6+430.00 TO STA. 18+340.00 (NET LENGTH: 11,910.00 LN.M.)16J00077 · ₱212,296,886.29 · mapped
- BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALLIG BRIDGE (B01158LZ) ALONG SANTIAGO -TUGUEGARAO ROAD, MALLIG, ISABELA20BF0067 · ₱211,978,475.56 · mapped
- ASSET PRESERVATION CONTRACT-PREVENTIVE MAINTENANCE (APC) COMPONENT, JICA LOAN AGREEMENT NO. PH-247 PM 01: CABAGAN-SAN PABLO ROAD SECTION (DAANG MAHARLIKA), K0444+000.00 TO K0460+752.00 W/ EXCEPTIONS, CABAGAN-SAN PABLO, ISABELA17B00060 · ₱206,607,204.73 · mapped
- WIDENING (2 INTO 4 LANES) OF SUAWAN BRIDGE (B00212MN) & APPROACHES ALONG DAVAO-BUKIDNON RD INCL. RRO17L00095 · ₱181,810,212.66
- LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS-CONSTRUCTION (COMPLETION) OF CABAGAN-STA. MARIA BRIDGE ALONG CABAGAN-STA. MARIA ROAD, ISABELA 1ST DISTRICT19B00045 · ₱149,315,846.60 · mapped
- ASSET PRESERVATION OF NAT'L RD:PREVENTIVE MAINTENANCE BASED ON PVM'T MNG'T SYSTEM(HDM-4) SANTIAGO-TU15B00075 · ₱140,153,994.05 · mapped
- ROAD WIDENING OF LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY 1ST DEO, K 1733+426.00 - K 1734+474.00, K 1734+474.00 - K 1734+918.00, K 1736+463.00 - K 1737+500.00, K 1747+060.00 - K1748+680.00, K 1750+800.00 - K1751+660.00, NET LENGTH: 4,997.00 L17J00074 · ₱126,233,256.18 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - CABAGAN-STA. MARIA BRIDGE (B03236LZ) ALONG CABAGAN-STA MARIA RD24B00084 · ₱115,768,472.92 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - ITAWES BRIDGE (B04245LZ) ALONG CAGAYAN-APAYAO ROAD22B00029 · ₱115,702,060.71 · mapped
- COLORADO BRIDGE ALONG CIRCUMFERENTIAL ROAD LEADING TO LAKE MAINIT, JABONGA, AGUSAN DEL NORTE21N00075 · ₱98,912,464.44 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD), BRGY. PATAGUELEG, PEÑABLANCA, CAGAYAN21BD0111 · ₱94,570,000.00 · mapped
- CONSTRUCTION OF TAWI-TAWI MAINLAND CIRCUMFERENTIAL ROAD, BUAN-PARANGAN, TAWI TAWI, STA.12+400.00 TO STA. 14+400.00 (NET LENGTH: 2,200.00 LN.M.)16J00081 · ₱92,381,467.26 · mapped
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-VARIOUS NATIONAL ROADS, TABUK CITY, RIZAL, PINUKPUK & TANUDAN, KALINGA18PL0041 · ₱91,126,035.90 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: ROAD WIDENING-PRIMARY ROADS-CAGAYAN VALLEY ROAD, BALZAIN-TANZA & CARIG SUR-CARIG NORTE SECTION, TUGUEGARAO CITY, CAGAYAN20B00033 · ₱81,980,496.23 · mapped
- ROAD UPGRADING (UNPAVED TP PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS (INTERMITTENT SECTIONS, GADU CARILUCOD-NABBOTUAN-PALAO-MACUTAY ROAD, SOLANA, CAGAYAN15B00051 · ₱75,511,233.70 · mapped
- RD. UPGRADING(UNPAVED TO PAVED) BASED ON GRAVEL RD. STRATEGIES(HDM-4 PROJ. ANALYSIS) GADU-CARILUCUD-15B00040 · ₱70,751,762.73 · mapped
- MF02: CONSTRUCTION OF FLOOD CONTROL SYSTEM, SAN VICENTE, IGUIG, CAGAYAN17BD0025 · ₱68,757,640.62 · mapped
- CONSTRUCTION/URGENT RIVER BANK PROTECTION WORKS, PHASE I, SAN VICENTE, IGUIG, CAGAYAN18BD0047 · ₱64,418,076.26 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF BUENAVISTA RIVER CONTROL ALONG MAGAT RIVER,21BI0018 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL SYSTEM, SAN ISIDRO, IGUIG, CAGAYAN, STA. 0+578 TO STA. 0+71416BD0001 · ₱47,524,949.91 · mapped
- CONCRETING OF TAWI-TAWI MAINLAND CIRCUMFERENTIAL ROAD, LAPID-LAPID-SUMANGAT-TARAWAKAN ROAD, TAWI-TAWI LD, K 28+560.00 TO K 29+720.00 (NET LENGTH: 1,160.00 LN.M.)16J00125 · ₱46,605,846.41 · mapped
- ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-ONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF STA LUCIA RIVER CONTROL (PHASE 2) ALONG MAGAT RIVER, ST20BI0007 · ₱46,477,480.00 · mapped
- CONST./REHAB. OF FLOOD CONTROL STRUCTURES, SAN AQUILINO RIVER CONTROL, ROXAS, OR. MINDORO16EI0006 · ₱46,307,738.70
- REHABILITATION OF ROAD (PUROK PAG-ASA, PUROK MASINULONDON AND TO PUROK MALIPAYON), STA. 0+000 - STA.0+240, STA.0+320 - STA.1+320, BRGY. BUAYAN, M'LANG, COTABATO24M00087 · ₱38,599,824.33 · mapped
- ROAD WIDENING - MATALAM-MLANG-BAGONTAPAY JCT RD - K1647+341 - K1648+51023MI0016 · ₱34,420,944.00 · mapped
- ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGEWIDENING OF PERMANENT BRIDGES, LIBAG BR. (B01909LZ) ALONG CAGAYAN VALLEY ROAD, TUGUEGARAO CITY, CAGAYAN19BD0059 · ₱32,523,207.08 · mapped
- CONSTRUCTION OF LAMBUG BRIDGE, PANGLIMA SUGALA, TAWI-TAWI LD, BEG. OF PROJECT: STA. 001+106.00, ABUTMENT A: STA. 001+204.58, ABUTMENT B: STA. 001+225.42, END OF PROJECT: STA. 001+270.00, (APPROACHES NET LENGTH: 143.16 LN.M.), (BRIDGE NET LENGTH: 20.84 LN16J00128 · ₱28,541,502.81 · mapped
- BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, DIDUNGO BRIDGE AND APPROACHES PHASE II INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ, VILLA SUR-SAN PEDRO-CABUAN-YSMAEL, DISIMUNGAL, QUIRINO16B00060 · ₱28,518,269.28 · mapped
- CONCRETING OF BARANGAY SANGA SANGA FARM TO MARKET ROAD BARANGAY SANGA SANGA, BONGAO, TAWI -TAWI20J00210 · ₱23,871,374.25 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - ITAWES BR. (B04245LZ) ALONG CAGAYAN-APAYAO ROAD23B00031 · ₱23,187,803.39 · mapped
- BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, TUNGCAB BRIDGE AND APPROACHES PHASE II INCLUDES RIGHT OF WAY ACQUISITION ALONG CORDON-AURORA BOUNDARY ROAD (ISABELA BOUNDARY-JUNCTION DUMABATO), QUIRINO16B00058 · ₱20,085,548.36 · mapped
- BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I CONTRACT PACKAGE 1B-PHASE II, CARAPPIGAN, BAYABO AND OLANGO 2 BRIDGE23BF0022 · ₱11,645,685.59 · mapped
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGE - ITAWES BR. (B04245LZ) ALONG CAGAYAN - APAYAO ROAD24B00074 · ₱9,648,732.01 · mapped
Equipment & capacity
PCAB license
- License no.
- 06483
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Nov 11, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 06483); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
9 evaluations listed across 5 GPPB CPES releases; average final rating 92.9% over 2 rated projects; 9 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Sep 22, 2025 | NIA | ₱768,430,319.00 | On-going | 90.7% | — | 40th, p. 249 |
| Jul 23, 2024 | DPWH (JV) | ₱48,778,642.00 | On-going | 93.2% | — | 38th, p. 194 |
| May 16, 2024 | DPWH | ₱274,900,604.00 | On-going | 91.4% | — | 38th, p. 194 |
| Nov 25, 2023 | DPWH | ₱115,702,061.00 | Completed | 93.2% | 92.3% | 37th, p. 86 |
| Sep 15, 2023 | DPWH (JV) | ₱714,000,498.00 | Final | 99.9% | 93.5% | 36th, p. 165 |
| Sep 14, 2023 | DPWH | ₱115,702,061.00 | On-going | 92.1% | — | 36th, p. 165 |
| Jun 5, 2023 | DPWH | ₱115,702,061.00 | On-going | 91.2% | — | 36th, p. 165 |
| Mar 17, 2023 | DPWH (JV) | ₱714,000,498.00 | On-going | 89.2% | — | 35th, p. 138 |
| Mar 3, 2020 | DPWH | ₱153,390,566.00 | On-going | 90.1% | — | 40th, p. 249 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 63 awards · ₱10,107,357,080.02
- NIA Infrastructure: 3 awards · ₱1,317,156,335.01
- Province of Cagayan Infrastructure: 14 awards · ₱526,994,230.51
- DOTr Infrastructure: 2 awards · ₱236,486,726.00
- Mactan-Cebu International Airport Authority Infrastructure: 2 awards · ₱221,115,689.91
- Province of Quirino Infrastructure: 3 awards · ₱133,544,355.75
- Province of Oriental Mindoro Infrastructure: 1 award · ₱55,173,579.09
- DPWH Goods & services: 8 awards · ₱9,753,723.43
- 25B00029₱282,757,606.91· 2025-02-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION II
- CONCRETING OF ROAD WITH LINE DRAINAGE CANAL
- 24Z00009
- IMRPOVEMENT OF ALABUG ALABIAO
- 24B00074
- NCB-RO2-CB17-24₱245,331,665.25· 2024-06-13· Other construction· NATIONAL IRRIGATION ADMINISTRATION - REGIONAL OFFICE NO. 2
- 24M00087₱38,479,246.14· 2024-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XII
- Construction of Calapangan₱738,453,619.84· 2024-03-06· Other construction· NATIONAL IRRIGATION ADMINISTRATION - CENTRAL OFFICE
- 24MC0051₱48,778,642.42· 2024-02-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 23B00080₱415,350,452.31· 2023-12-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION II
- 23B00040₱274,806,456.62· 2023-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION II
- 23B00031
- 23BF0022₱11,645,685.59· 2022-12-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ISABELA 2ND DEO
- 22B00029₱114,641,983.34· 2022-02-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION II
- 20B00033
- Concreting of Mabuttal - Payagan Road
- Concreting of Cabaritan - Alinunu Road
- 20B00028₱579,200,527.22· 2020-10-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION II
- 20BF0067₱209,032,835.79· 2020-09-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ISABELA 2ND DEO
- 20J00210
- SRIPD–C–26RW
- Concreting
- Concreting
- Concreting
- Construction
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →