SUNRISE BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 34 linked DPWH project(s) totaling about ₱614,411,896.47. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
SUNRISE BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 34
- Total value
- ₱614,411,896.47
- Published flags
- 8
- Region
- BILIRAN · Region VIII
Licensed officers (PCAB)
- Zenaida Coloma Malabanan · Authorized Managing Officer (PCAB license 39757) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SUNRISE BUILDERS — not an accusation or finding of wrongdoing.
Score: 84.60 / 100 · Projects in sample: 34 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.6/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 77.6
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 29
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 34
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 34
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 34
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 95.6/100 · Weight: 11%
- projects
- 34
- componentScore
- 95.6
- flagsPerProject
- 0.15
- publishedV2Flags
- 5
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 34
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
34 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE BILIRAN CIRCUMFERENTIAL ROAD - K1074+950 - K1075+220 (11.611093, 124.563013 TO 11.608852, 124.562516)22IA0085 · ₱38,108,229.55 · mapped
- Construction of Caraycaray Flood Control along Biliran Circumferential Road, Naval, Biliran22IA0025 · ₱29,397,165.65 · mapped
- Construction of Caraycaray Flood Control along Biliran Circumferential Road, Phase V, Naval, Biliran23IA0021 · ₱29,393,468.65 · mapped
- CONSTRUCTION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE VII, NAVAL, BILIRAN24IA0009 · ₱29,374,884.28 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AGPANGI, NAVAL, BILIRAN25IA0083 · ₱29,315,175.45 · mapped
- CONSTRUCTION OF ALMERIA FLOOD CONTROL STRUCTURE ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 2, ALMERIA, BILIRAN24IA0065 · ₱28,740,473.90 · mapped
- Construction of Lawaan Flood Control along Biliran Circumferential Road, Cabucgayan, Biliran22IA0054 · ₱28,475,794.90 · mapped
- Construction of Añog Flood Control Structure along Biliran Circumferential Road (Cabucgayan-Biliran Section), Cabucgayan, Biliran22IA0007 · ₱28,080,735.00 · mapped
- CONSTRUCTION OF GUERON FLOOD CONTROL ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD, PHASE I, NAVAL, BILIRAN24IA0021 · ₱26,578,803.68 · mapped
- REHABILITATION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.55998, 11.41286 TO 124.41359, 11.5583) 0+480 TO 0+710 (RIGHT SIDE UPSTREAM), CARAYCARAY, NAVAL, PROVINCE OF BILIRAN21IA0028 · ₱23,972,593.16 · mapped
- CONSTRUCTION OF BAGONGBONG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, ALMERIA, BILIRAN (124.383289°, 11.610992° - 124.385009, 11.610814°; 124.393246°, 11.615214° - 124.393602, 11.616887°)22IA0045 · ₱23,447,765.25 · mapped
- ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - TACLOBAN-BAYBAY - SOUTH RD - K0987+468-K0987+498, K1001+275-K1001+30525IG0047 · ₱20,308,500.00 · mapped
- CONSTRUCTION OF FLOOD PROTECTION STRUCTURE, BRGY. CARAYCARAY (124.41446, 11.55741 TO 124.41598, 11.55767 ) 0+858 TO 1+048 (RIGHT BANK UPSTREAM), CARAYCARAY, NAVAL, PROVINCE OF BILIRAN21IA0029 · ₱20,125,893.00 · mapped
- Construction of Bagombong Flood Control along Biliran Circumferential Road, Phase 5, Almeria, Biliran23IA0090 · ₱19,586,246.51 · mapped
- Construction of Cabibihan Flood Control, Brgy. Cabibihan, Caibiran, Biliran22IA0066 · ₱19,582,958.02 · mapped
- Construction of Busali Flood Control along Biliran Circumferential Road, Phase VI, Biliran, Biliran23IA0018 · ₱19,581,741.14 · mapped
- Construction of Alawihaw Flood Control along Naval-Caibiran Cross Country Road, Naval, Biliran22IA0097 · ₱18,983,276.90 · mapped
- Construction of Lawaan Flood Control along Biliran Circumferential Road, Phase III, Cabucgayan, Biliran23IA0022 · ₱18,964,633.20 · mapped
- CONSTRUCTION OF PANGASUGAN FLOOD CONTROL STRUCTURES, BAYBAY CITY, LEYTE20IG0008 · ₱18,806,200.00 · mapped
- Construction of Bagongbong Flood Control along Biliran Circumferential Road, Phase V, Almeria, Biliran23IA0068 · ₱14,694,663.36 · mapped
- Construction of Cabadiangan Flood Control along Naval-Caibiran Cross Country Road, Naval, Biliran22IA0082 · ₱14,215,927.25 · mapped
- Construction of Lawaan Flood Control along Biliran Circumferential Road, Phase 2, Cabucgayan, Biliran22IA0055 · ₱14,173,092.65 · mapped
- REHABILITATION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 4, CABUCGAYAN, BILIRAN (124.563499°, 11.4824322IA0009 · ₱14,038,675.00 · mapped
- REHABILITATION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 3, CABUCGAYAN, BILIRAN (124.564202°, 11.4804822IA0008 · ₱14,030,425.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL, BRGY. UNION, MAHAPLAG, LEYTE21IG0092 · ₱12,375,000.00 · mapped
- Construction of Seawall, Brgy. Inasuyan, Kawayan, Biliran22IA0113 · ₱9,601,120.25 · mapped
- CONCRETING OF BRGY. CALZADA TO BRGY. CASULONGAN TO CALZADA CIRUM FMR, BRGY. CALZADA, BRGY. CASULONGAN, BRGY. CALZADA CIRUM, JAVIER, LEYTE20IG0087 · ₱9,542,111.93 · mapped
- REPAIR/REHABILITATION OF PERMANENT BRIDGE DAMAGED BY TYPHOON ODETTE - CALAMBIS BRIDGE, CAIBIRAN, BILIRAN 11.57497 N, 124.56384 E22IA0132 · ₱9,533,085.12 · mapped
- REPAIR/REHABILITATION OF PERMANENT BRIDGE DAMAGED BY TYPHOON ODETTE - BOOL BRIDGE, CULABA, BILIRAN 11.67342817° N, 124.5207435° E22IA0131 · ₱9,515,982.77 · mapped
- Construction of Flood Control Phase III, Brgy . Anislagan, Naval, Biliran23IA0061 · ₱4,821,663.80 · mapped
- Construction of Flood Control Structure, Barangay Anislagan, Naval, Biliran23IA0023 · ₱4,790,143.20 · mapped
- CONSTRUCTION OF ROAD, SITIO JUMETILCO, BARANGAY IMELDA, NAVAL, BILIRAN 11.603845, 124.451315 - 11.600904, 124.44854522IA0091 · ₱4,787,667.90 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BILIRAN, NAVAL AND ALMERIA, BILIRAN21IA0138 · ₱4,372,000.00 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), NAVAL, ALMERIA, AND BILIRAN, BILIRAN PROVINCE22IA0133 · ₱3,095,800.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 39757
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Dec 11, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 39757); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 5 GPPB CPES releases; average final rating 90.6% over 3 rated projects; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 25, 2025 | DPWH | ₱26,578,804.00 | Completed | 93.7% | 89.1% | 39th (rev), p. 204 |
| Jul 29, 2024 | DPWH | ₱26,578,715.00 | On-going | 76.6% | — | 38th, p. 230 |
| Aug 22, 2023 | DPWH | ₱18,964,633.00 | Final | 92.5% | 90.0% | 36th, p. 202 |
| Jun 24, 2023 | DPWH | ₱38,108,230.00 | Final | 93.2% | 92.6% | 36th, p. 202 |
| Oct 2, 2022 | DPWH | ₱38,108,258.00 | On-going | 92.7% | — | 35th, p. 166 |
| Jun 24, 2022 | DPWH | ₱38,108,258.00 | On-going | 91.8% | — | 34th, p. 83 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 41 awards · ₱656,057,756.32
- City of Baybay Infrastructure: 1 award · ₱986,675.00
- Asset Preservation₱20,308,500.00· 2025-03-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 5TH ED
- 25IA0083₱29,315,175.45· 2025-02-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0065₱28,740,473.90· 2024-02-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0009₱28,786,461.41· 2024-01-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0021₱26,578,714.65· 2024-01-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 23IA0177
- 23IA0175₱14,605,210.70· 2023-12-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- Construction₱9,418,400.00· 2023-12-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 5TH ED
- 23IA0061
- 23IA0090₱19,037,276.65· 2023-03-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 22IA0147
- 22IA0142₱10,655,214.16· 2023-03-03· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 23IA0068₱14,400,326.65· 2023-02-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 23IA0021₱28,526,356.61· 2023-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 23IA0022₱18,964,633.20· 2023-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 23IA0023
- 23IA0018₱18,973,441.75· 2023-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 22IA0133
- 22IA0131
- 22IA0132
- 21IA0138
- 22IA0127
- 22IA0128
- 22IA0122
- 22IA0113
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →