REX E MORALES CONST is listed as a company organization in Philippine public procurement records on this site, with 82 linked DPWH project(s) totaling about ₱3,296,630,685.87. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
REX E MORALES CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 82
- Total value
- ₱3,296,630,685.87
- Published flags
- 0
- Region
- Leyte 3rd DEO · Region VIII
Online presence
Google Maps: Rex E. Morales Construction★ 4 (2 reviews)Google Maps, 2026-10-22
Purok 4, Barangay Linao, Ormoc City, Leyte, Ormoc City, Leyte
Licensed officers (PCAB)
- Rexes Escoton Morales · Authorized Managing Officer (PCAB license 17427) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for REX E MORALES CONST — not an accusation or finding of wrongdoing.
Score: 88.20 / 100 · Projects in sample: 82 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 85.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 85.4
- lateCompletedProjects
- 12
- onTimeCompletedProjects
- 64
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 79
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 92.7/100 · Weight: 24%
- totalProjects
- 82
- componentScore
- 92.7
- terminatedProjects
- 2
- terminationRatePct
- 2.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 81
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 82
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 82
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 67 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLYMALUNGON, SARANGANI16M00055 · ₱106,150,000.00
- ROAD WIDENING - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA ORMOC ROAD, K1084+000 - K1086+66924IF0055 · ₱100,714,767.47 · mapped
- CONSTRUCTION OF MUNICIPAL SYSTEM FACILITIES - LEVEL III, CABUCGAYAN, BILIRAN20I00061 · ₱100,002,444.32 · mapped
- LOCAL PROGRAM - BUILDING AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING EASTERN VISAYAS STATE UNIVERSITY CARIGARA, CAMPUS, CARIGARA, LEYTE23I00244 · ₱98,162,177.36 · mapped
- CONSTRUCTION OF EVACUATION CENTER/QUARANTINE FACILITY, BARANGAY CAMP DOWNES, ORMOC CITY, LEYTE24IF0109 · ₱95,079,064.66 · mapped
- CONSTRUCTION OF WATER SYSTEMS, ISLANDWIDE, IGACOS, DAVAO DEL NORTE20LC0144 · ₱93,604,886.41 · mapped
- CONSTRUCTION OF WATER SUPPLY PROJECT (LEVEL 3), LAOANG, NORTHERN SAMAR17II0129 · ₱87,205,558.30
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - STA. FE - PASTRANA - DAGAMI RD, K0933+514 - K0933+806.5, K0934+022 - K0938+109, K0938+292 - K0938+769, LEYTE 2ND LD20I00050 · ₱82,363,463.27 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-WATER SUPPLY-CONSTRUCTION OF WATER SUPPLY PROJECT, TOLEDO CITY, CEBU17H00031 · ₱80,523,700.00
- LOCAL PROGRAM - WATER MANAGEMENT FACILITIES - WATER SUPPLY - CONSTRUCTION OF WATER SUPPLY PROJECT, CATAINGAN, MASBATE18FJ0108 · ₱74,927,359.70 · mapped
- CONSTRUCTION OF DRAINAGE CANAL ALONG BILIRAN CIRCUMFERENTIAL ROAD (K1026+108 TO K1027+600), (K1037+250 TO K1039+020), PROVINCE OF BILIRAN18IA0053 · ₱74,581,300.00 · mapped
- CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, SAN REMEGIO, CEBU19HD0072 · ₱72,375,000.00 · mapped
- RE-ESTABLISHMENT OF DA-RF 08 INTEGRATED REGIONAL LABORATORY BUILDING, MAGSAYSAY BOULEVARD, TACLOBAN CITY, LEYTE18I00077 · ₱71,924,881.16 · mapped
- CONST. OF SLOPE PROTECTION (RETAINING WALL) ALONG RIZAL AVENUE EXTENSION ROAD PROJECT, KO905+(-823) - KO905+(-521) LS; KO905+(-714) - KO905+(-480) RS, TACLOBAN CITY15I00071 · ₱70,088,686.57 · mapped
- IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG DAANG MAHARLIKA, K0903+198 - K0904+000, K0904+000 - K0904+342, K0905+200 - K0907+184, S00002LT, (BRGY. NAGA-NAGA - CAIBAAN ROAD), TACLOBAN CITY15I00054 · ₱67,255,353.26 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION - ACCESS ROAD LEADING TO BAGONGBONG FALLS, BRGY. CAUCAB, ALMERIA, BILIRAN20I00027 · ₱59,565,329.31 · mapped
- Construction of Panilahan Flood Control, Ormoc City, Leyte23IF0012 · ₱57,696,132.04 · mapped
- ROAD WIDENING PALOMPON - ISABEL - MERIDA - ORMOC ROAD K1113+000 - K1113+614, K1113+630 - K1114+52323IF0004 · ₱51,048,498.64 · mapped
- LOCAL PROGRAM - LOCAL INFRA PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, TAGBILARAN EAST ROAD (TAGBILARAN - JAGNA), JAGNA, BOHOL, KO193+850 - KO193+96620HB0135 · ₱49,499,527.00 · mapped
- CONSTRUCTION OF 3 UNITS 2-STOREY 12-CL SCHOOL BUILDING, LILOAN NATIONAL TECHNICAL VOCATIONAL HIGH SCHOOL (SCHOOL ID 313409)LILOAN, SOUTHERN LEYTE16IL0126 · ₱49,395,961.47 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS BILIRAN CIRCUMFERENTIAL ROAD-K1090+000 -K1091+740 (11.541212°, 124.613757° - 11.531378°, 124.616277°)22IA0023 · ₱48,968,986.05 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROAD - K1043+150-K1044+940 (11.678652°, 124.357693° - 11.686535°, 124.371235°)21IA0051 · ₱48,758,376.53 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATIONPROGRAM/REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, JCT. (TER)-JAGNA-SIERRA BULLONES ROAD KO076 + 091 - KO07620HB0035 · ₱48,517,683.40 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG POBLACION KANANGA - KANAWAGAN RIVER FLOOD CONTROL AND PROTECTION WORK, KANANGA, LEYTE, LEYTE 4TH LD18I00064 · ₱48,244,575.06 · mapped
- ROAD WIDENING - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC ROAD, K1073+580 - K1075+00024IF0001 · ₱48,117,992.00 · mapped
- NETWORK DEVELOPMENT PROGRAM ROAD WIDENING - SECONDARY ROADS, LEMON-LEYTE-BILIRAN RD, K0979+050 - K0980+250, LEYTE, LEYTELEYTE, LEYTE20IE0061 · ₱48,019,903.09 · mapped
- CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURE, CADAC-AN RIVER BASIN, STA. 000+740 - STA. 000+895 (LEFT SIDE RIVER BANK) ABUYOG, LEYTE20I00010 · ₱47,679,965.74 · mapped
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON RD., K1010+880-K1010+950, K1013+750-K1013+800, K1014+250-K1014+310, K1019+480-K19IE0027 · ₱47,522,369.79 · mapped
- ASSET PRESERVATION:REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP,SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROAD LEMON-LEYTE-BILIRAN ROAD K0975+088-K0975+24018ID0080 · ₱47,254,752.23 · mapped
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS, CABUNGAAN-TABUNOK-CONSUEGRA RD., K1023+(-746)-K1023+(-706), K1021+804-K1021+884VILLABA, LEYTE19IE0033 · ₱47,188,743.44 · mapped
- NETWORK DEVELOPMENT- OFF CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, LEMON-LEYTE-BILIRAN RD S00109LT, K0977+000-K0977+990LEYTE, LEYTE18IE0055 · ₱47,039,901.38 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY, ALONG SAMBULAWAN JCT.-CALAGUISE-CALUBIAN ROAD, K0992+843-K0993+723, K0994+274-K0994+680, K0994+706-K0997+129, K0997+158-K0998+000, K1000+108-K1000+881, K1000+896-K1001+760LEYTE, LEYTE17IE0039 · ₱46,424,142.29 · mapped
- REHABILITATION/CONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, BILIRAN CIRCUMFERENTIAL ROAD, K1072+400 TO K1072+461 AND K1075+400 TO K1072+462 PINAMIHAGAN, CULABA (FROM 11.62958, 124.56049 TO 11.62921, 124.56051 AND FROM 11.60845, 124.561718IA0051 · ₱46,264,682.97 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - LA PAZ - JAVIER - BITO ROAD - K0962+(-063)-K0963+800, K0964+000-K0964+203, K0971+402-K0971+52419IG0035 · ₱45,833,620.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD, K0811+925-K0812+090 - K0812+275, K0812+315, SECOND DISTRICT, NORTHERN SAMAR18II0009 · ₱45,817,597.19 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF OFF-CARRIAGEWAY IMPROVEMENT ALONG BELEN-CONSUEGRA ROAD, S00112LT, K0980+-638 - K0981+783, K0982+000 - K0984+619, LEYTE, LEYTE16IE0014 · ₱45,602,326.55 · mapped
- REHAB./RECONST/ OF NAT'L. ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, ALONG CABUNGAAN-TABUNOK-CONSUEGRA ROAD, S00126LT, K1015+300 - K1015+414, K1015+600 - K1015+664, VILLABA, LEYTE16IE0012 · ₱44,601,854.84 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING-NATIONAL ROADS ALONG DAANG MAHARLIKA (LT) K0960+304-K0960+955, K0960+990-K0961+200,K0962+548-K0963+15418IG0028 · ₱43,854,020.00 · mapped
- REHAB./RECONST. OF OFF-CARRIAGEWAY IMPRVT. ALONG CABUNGAAN-TABUNOK-CONSUEGRA ROAD, KM.1014+(-349)-KM.1015+300, KM.1015+414-KM.1015+600, KM.1015+664-KM.1015+892,KM.1016+248-KM.1017+014,...,VILLABA, LEYTE16IE0006 · ₱41,848,863.88 · mapped
- LOCAL PROGRAM: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, WATER MANAGEMENT FACILITIES/WATER SUPPLY, CONSTRUCTION OF WATER SUPPLY PROJECT, DUMANJUG, CEBU18HG0105 · ₱40,963,943.99 · mapped
- CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, CAIBIRAN, BILIRAN (11.564423°, 124.575122° - 11.571239°, 124.580113°)21IA0071 · ₱39,752,545.51 · mapped
- CONSTRUCTION OF DUNGCA-AN FLOOD CONTROL STRUCTURES (PAGBANGANAN SECTION), BAYBAY CITY, LEYTE21IG0017 · ₱39,590,040.00 · mapped
- CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, KAWAYAN, BILIRAN (11.678913°, 124.357414°)21IA0081 · ₱37,632,111.47 · mapped
- REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG MILAGRO-HIBUNAON ROAD, ORMOC CITY24IF0097 · ₱37,336,023.98 · mapped
- REHAB./RECONST./UPGRADING OF OFF CARRIAGEWAY IMPRVT. INCLUDING DRAINAGE ALONG TABING-KAWAYAN-STA. ROSA-LAWIS-TABANGO ROAD, S00129LT, KM. 1032+102 - KM. 1034+132, KM. 1034+200 - KM. 1036+207, TABANGO, LEYTE16IE0009 · ₱37,265,836.23 · mapped
- CONSTRUCTION OF LAS NAVAS RIVER CONTROL PROJECT, LAS NAVAS, NORTHERN SAMAR20II0028 · ₱37,215,841.90 · mapped
- CONSTRUCTION OF EVACUATION CENTER, BARANGAY BUNGA, ABUYOG, LEYTE19I00125 · ₱33,699,053.36 · mapped
- CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, ALMERIA, BILIRAN (11.620385°, 124.379353°)21IA0086 · ₱29,989,107.20 · mapped
- CONSTRUCTION OF 2 UNITS 3 STOREY NINE CLASSROOM SCHOOL BUILDING,STA. MESA NATIONAL HIGH SCHOOL,DAGAMI,LEYTE16ID0074 · ₱29,920,507.87
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN ROAD, K0984+(-170) - K0984+(-113), K1000+718 - K1000+827, K1002+770 - K1002+800, K1003+546 - K1003+746, CALUBIAN & LEYTE17IE0025 · ₱29,879,881.12 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
