Flood Control and Drainage20I00010

CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURE, CADAC-AN RIVER BASIN, STA. 000+740 - STA. 000+895 (LEFT SIDE RIVER BANK) ABUYOG, LEYTE

CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURE, CADAC-AN RIVER BASIN, STA. 000+740 - STA. 000+895 (LEFT SIDE RIVER BANK) ABUYOG, LEYTE is a DPWH-tracked public work in Region VIII, Region VIII. Reported contract value: ₱47,679,965.74. Status: Reported complete (DPWH). Contractor on record: REX E MORALES CONST. Figures trace to dpwh.

Region VIII, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20I00010 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-06-18 → 2022-10-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱307,613 per linear m= 3.3x the Region VIII median (n=35)

Contract cost ₱47,679,966 ÷ 155 linear m read from the DPWH title (“STA. 000+740 - STA. 000+895”; station range length (Sta. a+b to c+d)). National percentile: 90. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Leyte

Based on the coordinates published with the DPWH record and NOAH file Leyte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURE, CADAC-AN RIVER BASIN, STA. 000+740 - STA. 000+895 (LEFT SIDE RIVER BANK) ABUYOG, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2020 GAA. DBM GAA FY2020

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

4. Implementation

Contract Amount

₱47,679,965.74

Progress

Reported complete (DPWH)

Start Date

December 3, 2020

Target End

September 10, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteAbuyogCadac-an
Storms whose wind field reached it
Nokaen 2026Koto 2025Kalmaegi 2025Bualoi 2025Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.