JMT CONST is listed as a company organization in Philippine public procurement records on this site, with 138 linked DPWH project(s) totaling about ₱4,249,972,825.11. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
JMT CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 138
- Total value
- ₱4,249,972,825.11
- Published flags
- 1
- Region
- Surigao del Norte 2nd DEO · Region XIII
Licensed officers (PCAB)
- JOEY MATTHEW ARREZA TAN · Authorized Managing Officer (PCAB license 14186) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JMT CONST — not an accusation or finding of wrongdoing.
Score: 90.10 / 100 · Projects in sample: 138 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 81.3/100 · Weight: 45%
- graceDays
- 30
- componentScore
- 81.3
- lateCompletedProjects
- 19
- onTimeCompletedProjects
- 110
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 138
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 20%
- totalProjects
- 138
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 20%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 138
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 10%
- projects
- 138
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
Component score: 99.6/100 · Weight: 5%
- projects
- 138
- componentScore
- 99.6
- linkedObservations
- 2
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 121 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE /BARANGAY STA. CRUZ, PLACER, SURIGAO DEL NORTE25NG0006 · ₱144,174,533.06 · mapped
- MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1148+000-K1150+50025N00042 · ₱120,274,330.02 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, DINAGAT-LORETO RD, K0001+000-K0002+860, K0016+468 - K0019+328, K0019+350 - K0019+700, K0020+520 - K0021+700, K0023+259 - K0024+000, K0024+740 - K0025+103, K0025+128 - K0025+489, K0025+505 - K0026+000, K0028+17N00056 · ₱112,689,800.83 · mapped
- ACCESS ROAD LEADING TO LORETO LANDING SITE/CAMPINTAC BLACK BEACH NO. 2, LORETO, DINAGAT ISLANDS23NE0064 · ₱105,478,146.26 · mapped
- CONSTRUCTION OF KINABUTAN FLOOD CONTROL/ SURIGAO CITY, SURIGAO DEL NORTE21NG0044 · ₱96,499,999.11 · mapped
- Construction of San Juan-Sta. Cruz-Santiago Shore Protection (Seawall), Loreto, Dinagat Islands22NE0056 · ₱95,534,810.12 · mapped
- ROAD UPGRADING (UNAPVED TO PAVED) DINAGAT - LORETO ROAD, K0011+217 - K0013+475, K0023+031 - K0023+246, K0023+259 - K0023+305, PROVINCE OF DINAGAT ISLANDS15N00059 · ₱88,294,076.86 · mapped
- Construction of Flood Mitigation Structure along Mabuhay River, Barangay Mabuhay, Sison, Surigao del Norte22NG0024 · ₱86,849,971.99 · mapped
- CONSTRUCTION OF ROAD, BARANGAY CAMP EDUARD TO BARANGAY FERLDA, ALEGRIA, SURIGAO DEL NORTE/ ALEGRIA, SURIGAO DEL NORTE23NG0035 · ₱77,199,580.17 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ALILO ENSOMO STREET AND PEDRO COLETO STREET, SURIGAO CITY, SURIGAO DEL NORTE25NG0043 · ₱76,815,878.47 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - SECONDARY ROADS, SURIGAO-DAVAO COASTAL ROAD K1168+875-K1169+177, K1169+200-K1170+282, K1170+298-K1170+400/GIGAQUIT, SURIGAO DEL NORTE21NG0071 · ₱75,488,710.30 · mapped
- NETWORK DEVELOPMENT ROAD WIDENING, SECONDARY ROAD (SURIGAO - DAVAO COASTAL ROAD) / GIGAQUIT, SURIGAO DEL NORTE, K1170+400.00 - K1171+846.0019NG0025 · ₱73,053,168.26 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM AT SAN JOSE, SAN JOSE, DINAGAT ISLANDS24NE0079 · ₱72,374,976.32 · mapped
- Construction of Bacuag River Flood Control Protection, Bacuag, Surigao del Norte22NG0039 · ₱71,651,428.31 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAGALLANES RIVER/ BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE21NG0029 · ₱67,549,998.06 · mapped
- CONSTRUCTION OF NRJ KAUSWAGAN TO SITIO TALISAY ROAD, SAN AGUSTIN, SURIGAO DEL SUR22NH0047 · ₱67,547,706.28 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG NARCISO STREET AND MAGALLANES STREET, SURIGAO CITY, SURIGAO DEL NORTE25NG0044 · ₱67,430,432.43 · mapped
- NETWORK DEVELOPMENT ROAD WIDENING, SECONDARY ROAD SURIGAO-DAVAO COASTAL ROAD / BACUAG, SURIGAO DEL NORTE, K1162+574.00 - K1164+849.0019NG0019 · ₱65,886,226.30 · mapped
- NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, JUNCTION CAPALAYAN-CABONGBONGAN ROAD/BRGY. CAPALAYAN, SURIGAO CITY, SURIGAO DEL NORTE, K1136+(-327) - K1138+03819NG0039 · ₱64,923,177.99 · mapped
- REPAIR/REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS AND BRIDGES, FLOOD CONTROL, OTHER PUBLIC BUILDINGS AND OTHER INFRASTRUCTURES DAMAGED BY TYPHOON ODETTE, CW1 @ DPWH DIDEO, BRGY. CUARINTA AND CW 2 ALONG DINAGAT-LORETO ROAD, DINAGAT ISLANDS21NE0090 · ₱62,709,175.85 · mapped
- CONSTRUCTION OF BRIDGE ALONG FERDINAND-MELGAR ROAD, BASILISA, DINAGAT ISLANDS22NE0046 · ₱62,098,259.45 · mapped
- IMPROVEMENT OF ROAD LEADING TO DPWH DINAGAT ISLANDS DISTRICT ENGINEERING OFFICE, BARANGAY WILSON, SAN JOSE, DINAGAT ISLANDS25NE0029 · ₱59,567,199.79 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION JCT. NATIONAL ROAD LEADING TO LUMONDO WATERFALLS ECO-PARK ROAD / BRGY. BUDLINGIN, ALEGRIA, SURIGAO DEL NORTE20NG0029 · ₱55,004,186.81 · mapped
- Construction of Flood Control Structure, Mainit Lakewall, Mainit, Surigao del Norte22NG0010 · ₱54,529,499.96 · mapped
- LIANGA COASTAL BYPASS ROAD (SDCR ALTERNATIVE ROUTE), LIANGA, SURIGAO DEL SUR19NH0051 · ₱50,786,193.50 · mapped
- CONSTRUCTION OF SPECIALTY HOSPITAL, BASILISA, DINAGAT ISLANDS16NE0091 · ₱49,499,988.42
- NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - SECONDARY ROADS, SURIGAO-DAVAO COASTAL RD - K1164+871.00 - K1166+000.00/ BACUAG, SURIGAO DEL NORTE20NG0001 · ₱49,382,035.76 · mapped
- CONSTRUCTION OF CAUSEWAY, BARANGAY TAFT, SURIGAO CITY, SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE22NG0121 · ₱48,999,999.20 · mapped
- Construction of River Control Structure, Barangay Dugsangon, Bacuag, Surigao del Norte22NG0012 · ₱48,999,993.79 · mapped
- Construction of Riverbank in Barangay Mabini, Mainit, Surigao del Norte22NG0013 · ₱48,999,990.04 · mapped
- Construction of Flood Mitigation Structure (Bad-as Flood Control), Bad-as, Placer, Surigao del Norte22NG0016 · ₱48,999,966.70 · mapped
- Construction of Revetment along Tago River, Tago, Surigao del Sur20NH0061 · ₱48,999,951.28 · mapped
- Construction of Flood Mitigation Structure, Motorpool, Tubod, Surigao del Norte22NG0027 · ₱48,999,671.93 · mapped
- CONSTRUCTION OF DIKE ALONG CREEK OF BARANGAY LUNA/BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE, STA.0+003.60 - STA.0+503.6018NF0061 · ₱48,998,740.30 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARANGAYS SAN ISIDRO AND VILLAFLOR / GIGAQUIT, SURIGAO DEL NORTE STA.0+679.00 - STA.0+955.0019NG0014 · ₱48,995,122.65 · mapped
- Construction of Flood Mitigation Structure along Magallanes River, Barangay Lahi, Gigaquit, Surigao del Norte22NG0020 · ₱48,990,622.84 · mapped
- CONSTRUCTION OF DPWH - SURIGAO DEL NORTE 2ND DEO BUILDING, SURIGAO CITY, SURIGAO DEL NORTE25NG0052 · ₱48,949,999.99 · mapped
- REHAB./RECON./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE SECONDARY ROADS, SURIGAO-DAVAO COASTAL ROAD, K1155+302 - K1157+384 - K1157+534/ PLACER, SURIGAO DEL NORTE16NF0120 · ₱48,901,962.36 · mapped
- CONSTRUCTION OF DUNGGOAN BRIDGE ALONG SAN JOSE-BAYANIHAN ROAD, LIBJO, DINAGAT ISLANDS22NE0037 · ₱48,498,593.39 · mapped
- Construction of Wave Breaker along the Coastlines of Barangays Alambique and Ipil, Gigaquit, Surigao del Norte22NG0011 · ₱48,409,915.17 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO AIRPORTS, SEAPORTS & DECLARED TOURISM DESTINATIONS - TO SEAPORTS / NRJ CITY MOTORPOOL - SITIO TUMANDAY - SABANG ACCESS ROAD TO LIPATA FERRY TERMINAL, SURIGAO AIRPORT, SURIGAO CITY, SURIGAO DEL NORTE K1116NF0163 · ₱47,529,923.38 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAGALLANES RIVER / BRGY. CAMAM-ONAN, GIGAQUIT, SURIGAO DEL NORTE21NG0015 · ₱46,938,466.66 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, NRJ RIZAL - TOGBONGON - MAT-I - MABINI - TRINIDAD ROAD PACKAGE 1 / BRGY. MAT-I - BRGY. MABINI, SURIGAO CITY, SURIGAO DEL NORTE20NG0037 · ₱46,000,592.31 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORT, CONSTRUCTION OF NRJ CAGNIOG-CAYUTAN-CANLANIPA PORT AREA ROAD, SURIGAO CITY, K1145+191-K1146+72715NF0124 · ₱44,886,670.76
- CONSTRUCTION OF MAINIT LAKEWALL / MAINIT, SURIGAO DEL NORTE K0+020.00 - K0+340.0019NG0009 · ₱39,199,360.91 · mapped
- Construction of Magtiaco River Flood Control Structure along Magtiaco Bridge (Phase 2), Barangay San Pedro, Alegria, Surigao del Norte22NG0023 · ₱39,180,150.39 · mapped
- CONSTRUCTION OF REVETMENT ALONG TAGO RIVER BASIN PACKAGE 1, TAGO, SURIGAO DEL SUR, TAGO, SURIGAO DEL SUR19NH0007 · ₱37,989,331.62 · mapped
- CONSTRUCTION OF KINABUTAN FLOOD CONTROL / BRGY. RIZAL, SURIGAO CITY, SURIGAO DEL NORTE, STA.1+359.00 - STA.1+731.8019NG0005 · ₱37,744,035.50 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, NRJ DAANG MAHARLIKA (LIPATA-SURIGAO SECTION) BIOBORJAN RIZAL - SABANG III LEADING TO LIPATA PORT / SURIGAO CITY, SURIGAO DEL NORTE24NG0054 · ₱36,896,366.02 · mapped
- CONSTRUCTION OF PEDESTRIAN OVERPASS AT MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1123+219, BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE25N00246 · ₱35,322,286.78 · mapped
Equipment & capacity
PCAB license
- License no.
- 14186
- Category
- AA · Large A
- Minimum net worth for this category
- ₱90,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱450M
- License valid until
- Jul 17, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 14186); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
13 evaluations listed across 6 GPPB CPES releases; average final rating 91.7% over 4 rated projects; 13 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 6, 2025 | DPWH | ₱120,274,330.00 | On-going | 92.5% | — | 40th, p. 167 |
| Jun 3, 2025 | DPWH | ₱144,174,533.00 | On-going | 92.4% | — | 40th, p. 167 |
| Mar 20, 2025 | DPWH | ₱72,374,976.00 | On-going | 94.0% | — | 40th, p. 167 |
| Mar 18, 2025 | DPWH | ₱77,199,580.00 | Completed | 97.8% | 86.4% | 40th, p. 167 |
| Apr 16, 2024 | DPWH | ₱76,427,262.00 | On-going | 78.8% | — | 39th (rev), p. 108 |
| Nov 24, 2023 | DPWH | ₱23,475,389.00 | Completed | 94.3% | 92.7% | 37th, p. 56 |
| Jun 20, 2023 | DPWH | ₱23,245,636.00 | On-going | 91.6% | — | 36th, p. 112 |
| Nov 23, 2022 | DOH | ₱46,462,431.00 | On-going | 89.5% | — | 35th, p. 92 |
| Oct 5, 2022 | DPWH | ₱48,999,992.00 | Completed | 96.6% | 97.3% | 35th, p. 92 |
| Jul 1, 2022 | DPWH | ₱48,499,984.00 | On-going | 97.8% | — | 34th, p. 46 |
| Aug 15, 2020 | DPWH | ₱37,744,076.00 | Completed | 92.3% | 90.5% | 37th, p. 56 |
| Aug 22, 2019 | DPWH | ₱37,989,331.00 | On-going | 89.6% | — | 40th, p. 167 |
Showing the 12 most recent of 13.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →