JBA CONST AND BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 67 linked DPWH project(s) totaling about ₱929,879,981.35. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JBA CONST AND BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 67
- Total value
- ₱929,879,981.35
- Published flags
- 0
- Region
- Mountain Province 1st DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- JOEL B AWILAN · Authorized Managing Officer (PCAB license 36321) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JBA CONST AND BUILDERS — not an accusation or finding of wrongdoing.
Score: 81.70 / 100 · Projects in sample: 67 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 68.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 68.7
- lateCompletedProjects
- 15
- onTimeCompletedProjects
- 44
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 67
- pastTargetOngoingProjects
- 8
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 67
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 67
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 67
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 67
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 57 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF FLOOD CONTROL ALONG CHICO RIVER, FALIWANG-CHICO KARAYAN BRIDGE, BONTOC, MOUNTAIN PROVINCE25PI0042 · ₱80,188,000.00 · mapped
- REHAB/RECONSTN OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, BAGUIO - BONTOC RD K0390+166 - K0390+286, K0390+410 - K0390+55021PI0089 · ₱77,200,000.00 · mapped
- MT. PROV.-ILOCOS SUR VIA TUE RD - KO408+700 - KO408+85024PI0124 · ₱63,368,655.00 · mapped
- Construction of Flood Control Mitigation Structure, Sao-Malitep along Chico River, Balili, Bontoc, Mountain Province23PI0072 · ₱49,000,000.00 · mapped
- NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND (CALAMITY FUND) - RECONSTRUCTION, REHABILITATION, REPAIR, AID, RELIEF AND OTHER WORKS OR SERVICES, INCLUDING PRE-DISASTER ACTIVITIES: IMPLEMENTATION OF VARIOUS FLOOD CONTROL PROJECTS IN MOUNTAIN PROVINC17PI0070 · ₱43,273,176.45
- Construction of Chico-Karayan-Tikitik Flood Control Structure, Sta. 29+000 - Sta. 29+760 (LS) along Chico River, Bontoc, Mountain Province22PI0023 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, SABANGAN MOUNTAIN PROVINCE22PI0082 · ₱29,400,000.00 · mapped
- CONSTN & MAINT OF FLOOD MITIG STRUCTURES & DRAINAGE SYSTEMS; CONSTN FC AL CHICO RIVER, BALILI STA 039+493-039+906...BONTOC, MT PROV17PI0009 · ₱28,234,022.07
- BAGUIO-BONTOC RD - K0358+663 - K0358+705, K0359+879 - K0359+895, K0361+119 - K0361+190, K0362+654 - K0362+694, K0372+817 - K0372+84220PI0079 · ₱25,584,351.34 · mapped
- INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BAGUIO-BONTOC RD, K0388+955 - K0391+30525PI0062 · ₱24,255,000.00 · mapped
- CONSTN OF GONOGON FLOOD CONTROL STRUCTURE, GONOGON, MOUNTAIN PROVINCE20PI0006 · ₱23,520,245.66 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT, BAGUIO-BONTOC RD - K0351+680 - K0351+800, K0360+908 - K0361+051, K0367+615 - K0367+780, K0367+850 - K0367+920, K0368+150 - K0368+250, K0368+904 - K0369+08222PI0019 · ₱21,807,940.00 · mapped
- MT PROV-ILOCOS SUR VIA TUE RD - K0391+318 - K0391+380, K0397+752 - K0398+000, K0408+963 - K0409+552, K0410+139 - K0410+23920PI0020 · ₱20,032,887.59 · mapped
- REHAB./ RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, MT. PROV. - ILOCOS SUR VIA TUE RD., K0389+400 - K0389+490, K0389+905 - K0389+1015, K0400+010 - K0400+035, K0400+23421PI0015 · ₱18,139,799.10 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - BAGUIO-BONTOC RD - KO379+309-KO379+364, KO381+580-KO381+660, KO383+200-KO383+415, KO385+390-KO385+54623PI0056 · ₱17,142,160.00 · mapped
- REHAB/RECONSTN OF NATL RDS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, MT PROV - ILOCOS SUR VIA TUE RD - K0388+165 - K0388+192, K0391+900 - K0392+020, K0392+160 - K0392+26021PI0063 · ₱14,700,000.00 · mapped
- REHAB/RECONSTN OF NATL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, MT PROV - CAGAYAN VIA TABUK - ENRILE RD, K0402+300 - K0402+33322PI0062 · ₱14,700,000.00 · mapped
- CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, MT PROV-CAGAYAN VIA TABUK-ENRILE RD - KO392+(-064)24PI0028 · ₱14,406,000.00 · mapped
- DISASTER RELATED AND EMERGENCY REHABILITATION FUND -FLOOD CONTROL SYSTEMS: REHABILITATION AND RESTORATION OF TENG-AB RETAINING WALL AND DRAINAGE SYSTEM IN BARANGAY POBLACION, BONTOC, MT. PROVINCE17PI0042 · ₱14,030,743.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - BAGUIO-BONTOC RD -K0359+810-K0359+920, K0360+000-K0360+130, K0365+684-K0365+77625PI0024 · ₱13,746,000.00 · mapped
- CONSTRUCTION OF ATO FLOOD CONTROL, STA. 31+360 - STA. 31+440 (L.S.) ALONG CHICO RIVER, BONTOC, MOUNTAIN PROVINCE21PI0034 · ₱13,743,524.94 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, CHICO KARAYAN BR. (B00924LZ) ALONG MT PROVINCE - N VIZCAYA RD22PI0015 · ₱12,740,000.00 · mapped
- NDRRMF - REHABILITATION/RESTORATION OF ROADSLIP ALONG MT. PROVINCE-ILOCOS SUR VIA TUE ROAD, K0412+930 - K0412+980, OTUCAN SUR, BAUKO, MT. PROVINCE18PI0067 · ₱12,633,507.34 · mapped
- CONSTN/UPGRAD/REHAB OF DRAINAGE ALONG NATIONAL ROADS, BAGUIO-BONTOC RD - K0343+070, K0369+340, K0378+714, K0383+900, K0384+86020PI0022 · ₱12,358,210.29 · mapped
- FARM-TO-MARKET ROAD (FMR) PROJECTS - CONCRETING OF SITIO GOTON TO SITIO BUEN, BRGY. BUSA FMR, BRGY. BUSA, SABANGAN, MOUNTAIN PROVINCE23PI0086 · ₱11,940,000.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, CALACABAN BR (B04293LZ) ALONG MT PROV - ILOCOS SUR VIA TUE RD22PI0072 · ₱11,760,000.00 · mapped
- CONSTN OF FLOOD CONTROL AL CHICO RIVER, STA. 26+900-STA.27+070, MATOYTOY-OK, BONTOC ILI, BONTOC, MT PROV20PI0004 · ₱11,101,262.02 · mapped
- CONSTN/UPGRAD/REHAB OF DRAINAGE ALONG NATL ROADS, BAGUIO-BONTOC RD - K0368+425, K0368+797, K0369+580, K0371+595, K0373+29624PI0084 · ₱10,780,000.00 · mapped
- REHAB/RECONSTN OF RDS W/ SLIPS, SLOPE COLLAPSE & LANDSLIDE, DANTAY-SAGADA RD K0392+060-K0392+170, K0394+190-K0394+204, K0395+282-K0395+29223PI0003 · ₱10,521,280.00 · mapped
- CONSTN OF FLOOD CONTROL ALONG CHICO RIVER, TAED, STA. 030+060-STA.032+378, BONTOC17PI0005 · ₱10,401,389.55
- ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, DANTAY-SAGADA ROAD, K0385+014 - K0385+106, K0385+237 - K0385+33521PI0013 · ₱10,231,200.00 · mapped
- LIP: LOCAL ROADS AND BRIDGES - LOCAL ROADS, CONSTRUCTION/ IMPROVEMENT OF SAGADA-BESAO PROVINCIAL ROAD, BESAO, MOUNTAIN PROVINCE21PI0010 · ₱9,900,000.00 · mapped
- CSSP - BUNGA-GAYANG-PALINA ROAD CONNECTING BUNGA AND GAYANG TO MOUNTAIN PROVINCE-ILOCOS SUR NATIONAL ROAD SUPPORTING HEIRLOOM RICE, COFFEE, BANANA CHIPS, AND OTHER INDUSTRIES, BUNGA, TADIAN, MOUNTAIN PROVINCE20PI0038 · ₱9,800,000.00 · mapped
- REHAB/RECONSTRUCTION OF NATL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, MT PROV - CAGAYAN VIA TABUK - ENRILE RD, K0400+640 - K0400+66522PI0061 · ₱9,800,000.00 · mapped
- NDRRMF-REHABILITATION/RECONSTRUCTION/REPAIR OF ENGKHAWA - SALIN FLOOD CONTROL, STA. 0+000 - STA. 0+200 (I.S.), SAMOKI, BONTOC, MT. PROVINCE18PI0056 · ₱9,549,039.31 · mapped
- CSSP - LACBABEN-MAGIYAD ROAD IN SUPPORT OF COFFEE, FOOD PROCESSING, AND HEIRLOOM RICE INDUSTRIES, BAUKO, MOUNTAIN PROVINCE20PI0033 · ₱9,486,556.65 · mapped
- NDRRMF - DRAINAGE PROTECTION WORKS: BAGUIO-BONTOC ROAD, K0390+180 - K0390+210, BONTOC ILI, DANTAY-SAGADA ROAD, K0385+(-160) - K0385+(-040), ALAB, BONTOC, MT. PROVINCE18PI0069 · ₱8,976,824.28 · mapped
- MT. PROV-CAGAYAN VIA TABUK-ENRILE RD - K0406 + 1001 - K0407 + 052, K0410 + 115 - K0410 + 288, K0410 + 509 - K0410 + 62925PI0028 · ₱8,770,600.00 · mapped
- MT PROV-CAGAYAN VIA TABUK-ENRILE RD- KO392+(-064)25PI0052 · ₱7,761,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, BAGUIO - BONTOC RD. K0369+580-K0369+690, K0371+251-K0371+34624PI0077 · ₱7,565,900.00 · mapped
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STD. (HDM-4 PROJECT ANALYSIS), TERTIARY, JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD (AMOLONG-TAWANG SECTION) CHAINAGE 177 - CHAINAGE 437)15PI0090 · ₱7,247,988.42 · mapped
- DISASTER RELATED AND EMERGENCY REHABILITATION FUND-NATIONAL ROADS:RESTORATION OF SABANGAN DETOUR BRIDGE,NACAGANG,SABANGAN.MT. PROVINCE BROUGHT ABOUT BY TYPHOON LAWIN (OCTOBER 2016)17PI0047 · ₱5,671,540.42
- REHAB/RECONSTN OF NATL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, DANTAY-SAGADA RD - K0388+600 - K0388+70020PI0027 · ₱5,085,287.93 · mapped
- IMPROVEMENT OF LOCAL ROAD, BARANGAY CAPINITAN, SABANGAN, MOUNTAIN PROVINCE22PI0051 · ₱4,950,000.00 · mapped
- BIP, CONSTRUCTION OF ROAD, BARANGAY GAYANG, SABANGAN, MOUNTAIN PROVINCE24PI0031 · ₱4,950,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - BUSA, SABANGAN, MOUNTAIN PROVINCE23PI0035 · ₱4,950,000.00 · mapped
- BIP- CONSTRUCTION OF ROAD, BARANGAY BUN-AYAN, SABANGAN, MOUNTAIN PROVINCE24PI0053 · ₱4,900,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY CAMATAGAN, SABANGAN, MOUNTAIN PROVINCE22PI0069 · ₱4,900,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM; BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BILA, BAUKO, MT. PROVINCE LONE DISTRICT16PI0014 · ₱4,798,612.88
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAMOKI, BONTOC, MT. PROVINCE20PI0080 · ₱4,752,752.19 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
