BENRAM CONST is listed as a company organization in Philippine public procurement records on this site, with 53 linked DPWH project(s) totaling about ₱2,625,209,646.91. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
BENRAM CONST
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 53
- Total value
- ₱2,625,209,646.91
- Published flags
- 0
- Region
- Zamboanga del Norte 3rd DEO · Region IX
Online presence
Google Maps: Benram Building★ 5 (1 reviews)Google Maps, 2026-10-22
Gov. Ramos Ave, Barangay Sta. Maria, Zamboanga City, 7000 Zamboanga del Sur
Licensed officers (PCAB)
- Benedicto Banua Ramos II · Authorized Managing Officer (PCAB license 32198) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for BENRAM CONST — not an accusation or finding of wrongdoing.
Score: 69.40 / 100 · Projects in sample: 53 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 41.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 41.9
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 25
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 50
- pastTargetOngoingProjects
- 18
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 53
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 53
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 53
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 53
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 50 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SAPA-SAPA - KOHEC NATIONAL HIGHWAY, SAPA-SAPA, TAWI-TAWI23J00203 · ₱168,863,821.56 · mapped
- CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), PACKAGE 6, SIOCON, ZAMBOANGA DEL NORTE25J00016 · ₱149,524,492.00 · mapped
- CRISTINO M. PARAGAS MEMORIAL HOSPITAL, QUINIPUT, ZAMBOAN-GA CITY24J00249 · ₱144,772,420.79 · mapped
- CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 324J00036 · ₱138,586,574.15 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS, SIOCON- SIRAWAI- SIBUCO- LIMPAPA RD- K2098 + 000 - K2102 + 30024JJ0008 · ₱118,912,125.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBULAO RIVER, PACKAGE 2, ZAMBOANGA CITY24JA0173 · ₱104,844,777.22 · mapped
- ROAD WIDENING - SECONDARY ROADS - ZAMBOANGA CITY-LABUAN-LIMPAPA RD - K1955 + 700.00 - K1957 + 644.0024J00115 · ₱88,399,428.42 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD -(S01151MN) CHAINAGE 23548 - CHAINAGE 24284, CHAINAGE 24608 - CHAINAGE 26765, CHAINAGE 26793 - CHAINAGE 2900025JJ0028 · ₱83,767,329.96 · mapped
- ROAD WIDENING - SECONDARY ROADS, SIOCON-SIRAWAI RD - K2091+400 K2094+00025JJ0020 · ₱82,737,153.13 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ ZAMBOANGA CITY23JA0024 · ₱74,285,286.38 · mapped
- PAVING OF UNPAVED ROADS (EARTH) ALONG ZAMBOANGA WEST COASTAL RD. (SIBUCO-SIRAWAI SECTION) - (S01166MN) CHAINAGE 16000 - CHAINAGE 18430, ZN.21JC0025 · ₱70,348,500.00 · mapped
- PROPOSED CONSTRUCTION/COMPLETION OF PANGIAN BRIDGE ALONG ZAMBOANGA WEST COASTAL ROAD, ZN.15JC0125 · ₱67,506,499.58
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ISABELA CITY, BASILAN23JH0024 · ₱67,499,312.64 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PANUNSULAN - LANOTE - CALVARIO - MALIGUE BY-PASS ROAD, BASILAN23J00076 · ₱66,213,708.93 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG ZAMBOANGA WEST COASTAL RD (SIBUCO-SIRAWAI SECTION) (S01166MN), CHAINAGE 2223 - CHAINAGE 2287, CHAINAGE 3915 - CHAINAGE 398723JJ0047 · ₱64,655,000.00 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS BANARAN - LOOKAN ROAD (S00001TW)22J00109 · ₱57,900,000.00 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS, ZAMBOANGA WEST COASTAL RD (SIBUCO-LIMPAPA SECTION) - (S01152MN) CHAINAGE 5761 - CHAINAGE 903025JJ0001 · ₱55,274,130.35 · mapped
- ROAD WIDENING INCLUDING DRAINAGE ALONG BASILAN CIRCUMFERENTIAL ROAD (TUMAHUBONG-SUMISIP-MALUSO ROAD SECTION) STA. 76+740 - STA. 78+62020JH0025 · ₱50,448,926.74 · mapped
- PAVING OF UNPAVED ROADS - SECONDARY ROADS, ZAMBOANGA WEST COASTAL RD (SIBUCO - SIRAWAI SECTION) - (S01166MN) CHAINAGE 14094 - CHAINAGE 1600023JJ0008 · ₱50,180,000.00 · mapped
- PAVING OF UNPAVED ROADS - SECONDARY ROADS, ZAMBOANGA WEST COASTAL ROAD (SIBUCO-SIRAWAI SECTION) S01166MN CHAINAGE 12494-CHAINAGE 14094, ZN.22JC0059 · ₱49,000,000.00 · mapped
- REHABILITATION OF BALAKAN - CALUCAP ROAD IN SALUG, ZAMBOANGA DEL NORTE24JD0027 · ₱49,000,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE) UPPER LA PAZ, ZAMBOANGA CITY22JA0007 · ₱48,174,875.53 · mapped
- CONSTRUCTION /REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROAD WIDENING - PAGASINAN - KARUNGDUNG ROAD20J00111 · ₱47,766,771.33 · mapped
- WIDENING OF PERMANENT BRIDGES - LABUAN BR. (B01921MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA RD22JA0012 · ₱44,109,637.16 · mapped
- PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY-SIOCON RD - K2040 + 896 - K2042 + 000, K2044 + 500 - K2044+ 87024JJ0023 · ₱44,100,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PIACAN RIVER, BARANGAY PIACAN, SIRAWAI, ZAMBOANGA DEL NORTE25JJ0030 · ₱44,079,347.93 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIBUCO RIVER (SIBUCO BR. - B02035MN), SIBUCO, ZAMBOANGA DEL NORTE25JJ0025 · ₱44,079,345.07 · mapped
- REHABILITATION OF BALAKAN-CALUCAP ROAD IN SALUG, ZAMBOANGA DEL NORTE23JD0011 · ₱43,120,000.00 · mapped
- ROAD WIDENING, LILOY-SIOCON RD - K2071 + 930 - K2073 + 00025JJ0014 · ₱41,387,586.87 · mapped
- CONSTRUCTION OF ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS, BARANGAY UPPER LA PAZ, ZAMBOANGA CITY21JA0031 · ₱39,597,720.22 · mapped
- Construction of Shoreline Protection at Sinunuc Section, Zamboanga City22JA0017 · ₱39,253,426.63 · mapped
- CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, PACKAGE 2, ZAMBOANGA CITY23J00050 · ₱38,414,992.94 · mapped
- WIDENING OF PERMANENT BRIDGES - TONGGUSONG BRIDGE ALONG TONGGUSONG - TUBIG INDANGAN NATIONAL ROAD20J00115 · ₱38,213,663.51 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - LAUM - LIKUD SIKUBONG ROAD20J00107 · ₱35,310,351.24 · mapped
- WIDENING OF PERMANENT BRIDGES BANGAYAN PARALLEL BR. ALONG ZAMBOANGA CITY - LABUAN - LIMPAPA RD21JA0011 · ₱29,755,174.38 · mapped
- PROPOSED CONSTRUCTION OF NASAL BRIDGE ALONG ZAMBOANGA WEST COASTAL ROAD, ZN.15JC0124 · ₱29,293,399.70
- PROPOSED CONSTRUCTION OF LIYANG BRIDGE ALONG ZAMBOANGA WEST COASTAL ROAD,15JC0123 · ₱29,293,387.74
- CONSTRUCTION OF REINFORCED CONCRETE WALL FOR SLOPE PROTECTION ALONG LILOY-SIOCON RD. (S01146MN), K2010+946.00 - K2010+990.00, K2011+197.00 - K2011+249.00, GUTALAC, ZAMBOANGA DEL NORTE19JC0058 · ₱24,968,101.59 · mapped
- PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY - SIOCON RD - K2037 + 000 - K2037 + 494, ZN.22JC0020 · ₱24,500,000.00 · mapped
- WIDENING OF PERMANENT BRIDGES LATAP BR. (NEW)(B01770MN) ALONG ZAMBOANGA CITY - LABUAN - LIMPAPA RD21JA0012 · ₱20,343,657.21 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, LILOY-SIOCON RD - K2014 + 422 - K2014 + 485, ZN.21JC0014 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF RIVER CONTROL FROM CALLE DAPITAN TO CEBU RIVER TC BRIDGE, POBLACION, SIBUCO, ZAMBOANGA DEL NORTE20JC0017 · ₱19,599,998.94 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, LILOY-SIOCON RD - K2031 + 208 - K2031 + 235, K2031 + 847 - K2031 + 88225JJ0010 · ₱16,445,379.59 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, LILOY-SIOCON RD -K2028 + 950 - K2028 + 995, K2029 + 615 - K2029 + 675, K2032 + 500 - K 2032 + 600, ZN.21JC0015 · ₱15,054,166.96 · mapped
- CONCRETING/IMPROVEMENT OF BALAKAN-CALUCAP ROAD IN SALUG, PHASE II, ZAMBOANGA DEL NORTE21JC0050 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF ROAD, CARACOL, SALUG, ZAMBOANGA DEL NORTE22JC0050 · ₱9,800,000.00 · mapped
- CONCRETING OF BALAKAN - CALUCAP ROAD, SALUG, ZAMBOANGA DEL NORTE20JC0078 · ₱4,850,203.32 · mapped
- CONCRETING OF SITIO BITONG, BRGY. CURUAN FMR, BRGY. CURUAN, ZAMBOANGA CITY18JA0112 · ₱4,827,825.80 · mapped
- WIDENING OF R.T. LIM BOULEVARD, BALIWASAN - KAMPUNG ISLAM SECTION, INCLUDING RROW ACQUISITION, ZAMBOANGA CITY, K1941+900 TO K1942+000.00 (NET LENGTH: 100.00 LN.M.)16J00060 · ₱4,702,730.19 · mapped
- CONSTRUCTION OF RAIN WATER COLLECTOR CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) FOR FY 2020 (20 CLUSTERS)20J00233 · ₱4,075,817.88 · mapped
Equipment & capacity
PCAB license
- License no.
- 32198
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Mar 30, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 32198); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
14 evaluations listed across 6 GPPB CPES releases; average final rating 94.0% over 3 rated projects; 13 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 9, 2025 | DPWH | ₱44,079,350.00 | On-going | 95.2% | — | 40th, p. 219 |
| Jul 31, 2024 | DPWH (JV) | ₱118,711,924.00 | On-going | 96.6% | — | 38th, p. 228 |
| Apr 23, 2024 | DPWH | ₱74,285,286.00 | On-going | 90.7% | — | 38th, p. 36 |
| Nov 23, 2023 | DPWH | ₱43,120,000.00 | Completed | 96.2% | 94.1% | 37th, p. 15 |
| Nov 23, 2023 | DPWH | ₱50,180,000.00 | Completed | 92.2% | 92.1% | 37th, p. 15 |
| Sep 7, 2023 | DPWH | ₱43,120,000.00 | On-going | 89.3% | — | 36th, p. 31 |
| Sep 4, 2023 | DPWH | ₱44,109,637.00 | On-going | 69.1% | — | 36th, p. 31 |
| Jun 21, 2023 | DPWH | ₱50,180,000.00 | On-going | 92.0% | — | 36th, p. 31 |
| Jun 20, 2023 | DPWH | ₱4,312,000.00 | On-going | 96.0% | — | 36th, p. 31 |
| Jun 19, 2023 | DPWH | ₱48,999,879.00 | Final | 93.4% | 95.8% | 36th, p. 31 |
| Oct 6, 2022 | DPWH | ₱48,174,876.00 | On-going | 97.4% | — | 35th, p. 25 |
| Oct 6, 2022 | DPWH | ₱44,109,637.00 | On-going | 96.2% | — | 35th, p. 25 |
Showing the 12 most recent of 14.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →