ACIER is listed as a company organization in Philippine public procurement records on this site, with 24 linked DPWH project(s) totaling about ₱370,075,587.91. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
ACIER
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 24
- Total value
- ₱370,075,587.91
- Published flags
- 0
- Region
- Albay 2nd DEO · Region V
Public Record Grade
A transparent, data-derived summary of reported public records for ACIER — not an accusation or finding of wrongdoing.
Score: 63.60 / 100 · Projects in sample: 24 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 26.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 26.3
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 10
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 24
- pastTargetOngoingProjects
- 14
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 24
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 24
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged projects — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY VIGA, RAPU-RAPU,25F00117 · ₱141,563,108.09 · mapped
- CONSTRUCTION OF WATER SYSTEM LEVEL II IN BRGY. BALIGANG, BRGY. BONGABON, BRGY. CAGUIBA, BRGY. DEL ROSARIO, BRGY. ILULUAN, AND BRGY. MITI, CAMALIG, ALBAY22FB0264 · ₱28,429,729.95 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, BATO, CAMARINES SUR, NIÑO JESUS, CARICOT, BACOLOD, SALVA23F00367 · ₱23,352,938.14 · mapped
- CLUSTER 14- REPAIR & REHAB. OF CLASSROOMS @ BALADING ELEM. SCHOOL, MALINAO, ALBAY & MALILIPOT NAT'L. HIGH SCHOOL, MALILIPOT, ALBAY23FA0046 · ₱19,552,500.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II IN THE MUNICIPALITY OF BALATAN, CAMARINES SUR, PARARAO, SANTIAGO NACACALE, P23F00365 · ₱19,180,828.25 · mapped
- CLUSTER 27-CONSTRUCTION OF WATER SYSTEM LEVEL II, IN THE FIRST DISTRICT OF ALBAY20FA0048 · ₱15,345,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II IN IRIGA CITY, CAMARINES SUR, SAN NICOLAS, SAN RAMON AND STO. DOMINGO, IRIGA23F00369 · ₱14,386,702.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FRANCIA, IRIGA CITY, CAMARINES SUR23F00207 · ₱9,651,639.47 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, BAAO, CAMARINES SUR, IYAGAN AND BAGUMBAYAN, BAAO, CAMARI23F00368 · ₱9,649,950.94 · mapped
- LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING, GOGON HIGH SCHOOL, BARANGAY GOGON, LEGAZPI CITY, ALBAY21FB0131 · ₱9,643,043.02 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II IN BATO, CAMARINES SUR, SAN ROQUE AND AGOS, BATO, CAMARINES SUR (5TH LEGISLA23F00370 · ₱9,578,561.44 · mapped
- SIPAG: REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. TULA-TULA, LEGAZPI CITY, ALBAY22FB0278 · ₱9,398,025.18 · mapped
- SIPAG: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BUENAVISTA, LEGAZPI CITY, ALBAY22FB0277 · ₱7,592,723.38 · mapped
- BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT BICOL REGIONAL TRAINING AND TEACHING HOSPITAL (BRTTH), BARANGAY SAGPON, DARAGA, ALBAY22FB0088 · ₱4,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II AT BRGY. POBLACION II, STA. MAGDALENA, SORSOGON, POBLACION II, STA. MAGDALENA, SORSO23F00378 · ₱4,949,981.28 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II AT BRGY. MANJUMLAD, MATNOG, SORSOGON, MANJUMLAD, MATNOG, SORSOGON (2ND LEGISLATIVE D23F00324 · ₱4,949,976.04 · mapped
- BIP: CONSTRUCTION OF RIZAL MULTI-PURPOSE BUILDING, BARANGAY RIZAL, LEGAZPI CITY, ALBAY22FB0035 · ₱4,949,946.88 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM(LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II AT BRGY. PINIT, OCAMPO, CAMARINES SUR, OCAMPO, CAMARINES SUR(3RD LEGISLATIVE DISTRICT23F00204 · ₱4,949,632.99 · mapped
- BIP: CONSTRUCTION OF BITANO MULTI-PURPOSE BUILDING, BARANGAY 37 - BITANO, LEGAZPI CITY, ALBAY22FB0027 · ₱4,949,494.31 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONCRETING OF SITIO SAN ISIDRO ROAD, BARANGAY PURO, LEGAZPI CITY21FB0143 · ₱4,898,445.96 · mapped
- BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT ANISLAG RESETTLEMENT SITE, BARANGAY ANISLAG, DARAGA, ALBAY22FB0082 · ₱4,794,058.47 · mapped
- BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT BIGAO ELEMENTARY SCHOOL, BARANGAY BIGAO, DARAGA, ALBAY22FB0089 · ₱4,793,999.71 · mapped
- SIPAG: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BARIIS LEGAZPI CITY, ALBAY22FB0251 · ₱4,747,918.09 · mapped
- LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF WATER SYSTEM (LEVEL II), BRGY. ANISLAG, DARAGA, ALBAY21FB0167 · ₱3,817,384.32 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →