MAVERICK BUILDERS INC FORMERLY MAVERICK is listed as a company organization in Philippine public procurement records on this site, with 137 linked DPWH project(s) totaling about ₱8,175,939,596.32. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MAVERICK BUILDERS INC FORMERLY MAVERICK
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 137
- Total value
- ₱8,175,939,596.32
- Published flags
- 2
- Region
- Davao Oriental 2nd DEO · Region XI
Online presence
Google Maps: Maverick Builders Inc.★ 5 (2 reviews)Google Maps, 2026-10-22
3JWG+4J6, Park Ave, Agdao, Davao City, Davao del Sur
Licensed officers (PCAB)
- Dennis Jordan Uy Ching · Authorized Managing Officer (PCAB license 14466) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MAVERICK BUILDERS INC FORMERLY MAVERICK — not an accusation or finding of wrongdoing.
Score: 88.80 / 100 · Projects in sample: 137 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 80.4
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 115
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 129
- pastTargetOngoingProjects
- 14
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 97.8/100 · Weight: 21%
- totalProjects
- 137
- componentScore
- 97.8
- terminatedProjects
- 1
- terminationRatePct
- 0.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 137
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 137
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 137
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 133 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF CONCRETE ROAD - NHJ DAWAN - MAMALI - MACAMBOL - MAGUM - CABUAYA ROAD, MATI CITY, PACKAGE 2, DAVAO ORIENTAL20L00107 · ₱258,732,404.95 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NHJ DAWAN - MAMALI - MACAMBOL - MAGUM - CABUAYA ROAD, MATI CITY, PACKAGE 2, DAVAO ORIENTAL20L00108 · ₱230,762,409.24 · mapped
- CONSTRUCTION OF CONCRETE ROAD-BAGANGA DIVERSION ROAD, DAVAO ORIENTAL20L00096 · ₱181,256,928.56 · mapped
- ROAD UPGRADING (GRAVEL TO CONCRETE) OF COMPOSTELA-CATEEL RD (COMPOSTELA SIDE),NURSERY-OSMENA SECTION15L00028 · ₱145,464,014.82 · mapped
- ROAD UPGRADING (GRAVEL TO CONCRETE) OF COMPOSTELA-CATEEL RD (COMPOSTELA SIDE),PANANSALAN-NURSERY SEC15L00027 · ₱145,304,858.32 · mapped
- CONCRETING OF BATAWAN PROPER,BRGY. BATAWAN-NURSERY,BRGY. BINONDO,DAVAO ORIENTAL (1ST CONG. DISTRICT)15L00104 · ₱144,612,697.00 · mapped
- WIDENING (2 INTO 4 LANES) OF PRES. DIOSDADO P. MACAPAGAL NAT'L. HI-WAY INCL. SLOPE PROTECTION & ROW18L00083 · ₱139,818,438.45 · mapped
- WIDENING (2 INTO 4 LANES) OF PRES. DIOSDADO P. MACAPAGAL NAT'L. HI-WAY INCL. SLOPE PROTECTION & ROW18L00082 · ₱139,346,143.04 · mapped
- WIDENING (2 INTO 4 LANES) OF SURIGAO DEL SUR BDRY.-DVO. OR. COASTAL RD INCL. ROW (BRGY. BACULIN-BRGY18L00028 · ₱138,517,189.03 · mapped
- ROAD WIDENING ALONG SURIGAO DEL SUR BDRY. - DAVAO OR COASTAL RD - K1558+648 - K1562+000, DAVAO ORIENTAL24L00269 · ₱136,682,189.29 · mapped
- ROAD WIDENING ON SPECIFIC LOCATIONS ALONG SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (S00140MN)19L00069 · ₱131,230,581.51 · mapped
- WIDENING (2 INTO 4 LANES) OF PRES. DIOSDADO P. MACAPAGAL NAT'L. H'WAY INCL. SLOPE PROTECTION & ROW (17L00076 · ₱125,207,257.00 · mapped
- WIDENING (2-4 INTO 6 LANES) OF DAANG MAHARLIKA (MN) (BRGY. MAGSAYSAY SECT.),COMPOSTELA VALLEY 2ND DI17L00046 · ₱122,772,779.36
- WIDENING (2 INTO 4 LANES) OF SURIGAO DEL SUR BDRY.-DAVAO OR. COASTAL RD INCL. RROW (BRGY. LUCOD-BRGY17L00115 · ₱122,125,198.89 · mapped
- WIDENING (2 INTO 4 LANES) OF COMPOSTELA-CATEEL ROAD INCLUDING ROW, DAVAO ORIENTAL18L00057 · ₱121,967,967.56 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NATIONAL HIGHWAY JUNCTION SAKUAN TO BARANGAY ALVAR TO SITIO BANTOLINAO, BARANGAY PALMA GIL TO SITIO TUBILAN, BARANGAY PICHON ROAD CONNECTING CARAGA PUBLIC TERMINAL TO ABACA PROCESSING AND HAND LOOM (DAGMAY) WEAVING IN SUPPO23L00057 · ₱121,952,029.13 · mapped
- WIDENING (4-6 LANES) OF DAANG MAHARLIKA (MN) (BRGY. POB. MONTEVISTA-BRGY. LINOAN SECT.),COMPOSTELA17L00039 · ₱117,821,971.48
- ROAD WIDENING ON SPECIFIC LOCATIONS ALONG SURIGAO DEL SUR BDRY. DAVAO OR. COASTAL ROAD (S00140MN), D20L00095 · ₱113,041,034.47 · mapped
- ROAD CONCRETING OF NATIONAL HIGHWAY JUNCTION - LANCA - TAGUGPO - MARAGATAS, DAVAO ORIENTAL21L00121 · ₱112,130,141.64 · mapped
- ROAD WIDENING ON SPECIFIC LOCATIONS ALONG COMPOSTELA-CATEEL ROAD (DAVAO ORIENTAL SIDE) (S01389MN),DA19L00068 · ₱111,687,586.47 · mapped
- WIDENING (2 INTO 4 LANES) OF PRES. DIOSDADO P. MACAPAGAL NAT'L. H'WAY INCL. SLOPE PROTECTION & ROW (17L00077 · ₱110,826,761.41 · mapped
- WIDENING 2 INTO 6 LANES OF DAVAO-COT. RD (DAVAO CITY-JCT. DIGOS SECT.) INCL. ROAD RIGHT-OF-WAY (RROW17L00015 · ₱109,334,220.26 · mapped
- CONSTRUCTION OF CONCRETE ROAD-BAGANGA DIVERSION ROAD, DAVAO ORIENTAL19L00070 · ₱107,322,344.17 · mapped
- IMPVT./UPGRADING (GRAVEL TO CONC.) OF JCT. MENZI-DAHICAN-LAWIGAN RD LEADING TO CINCO MASAO BEACH RES15L00072 · ₱106,218,049.61 · mapped
- CONSTRUCTION OF SUMLOG PARALLEL BRIDGE (COMPLETION OF SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) ALONG PRES. DIOSDADO P. MACAPAGAL NATIONAL HI-WAY, DAVAO ORIENTAL21L00118 · ₱101,051,932.83 · mapped
- CONSTRUCTION OF SUMLOG PARALLEL BRIDGE ALONG PRES. DIOSDADO P. MACAPAGAL NATL HI-WAY, LUPON, DAVAO ORIENTAL22L00161 · ₱98,999,850.59 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE - BAGANGA DIVERSION ROAD, DAVAO ORIENTAL21L00105 · ₱98,780,016.24 · mapped
- CONSTRUCTION OF NHJ DAWAN - MAMALI - MACAMBOL - MAGUM - CABUAYA ROAD, MATI CITY, PACKAGE 1, DAVAO ORIENTAL22L00102 · ₱96,499,956.48 · mapped
- Construction of Flood Mitigation Structure along Caraga River (Lower San Pedro Protection), Caraga, Davao Oriental23LF0074 · ₱96,499,134.78 · mapped
- CONCRETING OF CATEEL DIVERSION ROAD INCLUDING ROW, DAVAO ORIENTAL18L00027 · ₱94,896,925.06 · mapped
- Construction of Flood Mitigation Structure along Lanca-Luban-Cabuaya Creek, Sta. 0+000 - Sta. 1+800, Mati City, Davao Oriental22LG0046 · ₱94,474,095.60 · mapped
- OPENING/CONSTRUCTION/REHAB. OF BAGANGA-BINONDO-BOUNDARY DAVAO ORIENTAL/COMPOSTELA VALLEY,DAVAO ORIEN15L00112 · ₱93,219,680.23 · mapped
- Construction of Flood Mitigation Structure along Caraga River (Cut-Off Channel), Sta. 0+000 - Sta. 0+750, Caraga, Davao Oriental22LF0031 · ₱92,989,850.86 · mapped
- CONST./OPENING OF BAGANGA DIVERSION ROAD INCLUDING ROW, DAVAO ORIENTAL18L00068 · ₱92,708,189.19 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT ALONG SUMLOG RIVER, BARANGAY CABADIANGAN-COCORNON-LANGKA, LUPON, DAVAO ORIENTAL25LG0002 · ₱92,443,242.41 · mapped
- ROAD WIDENING (2 INTO 4 LANES) OF SURIGAO DEL SUR BDRY. - DAVAO ORIENTAL COASTAL ROAD INCLUDING DRAINAGE, SLOPE PROTECTION AND RROW, K1588+339 TO K1588+826.60 TO K1589+600, K1590+000 TO K1590+200 AND K1590+200 TO K1590+354, BAGANGA, DAVAO ORIENTAL 1ST LD17LF0025 · ₱91,076,650.18 · mapped
- WIDENING OF DIGOS-MAKAR ROAD INCLUDING ROAD RIGHT-OF-WAY (RROW) ZONE I-SAN JOSE SECTION,DAVAO DEL SU15L00073 · ₱90,682,074.21 · mapped
- WIDENING (2 INTO 4 LANES) OF SURIGAO DEL SUR BDRY.-DVO. OR. COASTAL RD INCL. SLOPE PROTECTION & RROW17L00114 · ₱89,958,697.84 · mapped
- SURIGAO DEL SUR BDRY.-DAVAO OR COASTAL RD - K1597+915 TO K1599+664 TO K1600+647 - K1601+901, BAGANGA, DAVAO ORIENTAL22LF0044 · ₱89,499,050.42 · mapped
- ROAD WIDENING ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) INCL. ROA - K1568+200-K1568+491,K1568+529-K1569+197,K1569+230-K1569+338,K1569+600-K1569+727,K1581+434-K1581+927,K1581+959-K1582+027,K1582+118-K1583+259,(SOO165MN) CHAINAGE 000 - CHAINAGE 201,18LD0006 · ₱88,779,990.62 · mapped
- CONST. OF MATI-TARRAGONA BYPASS ROAD (TAGABAKID-LUCATAN ROAD), INCLUDING ROW, DAVAO ORIENTAL 2ND LD16L00021 · ₱88,764,228.15
- SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD - K1604+966 - K1608+799, CARAGA, DAVAO ORIENTAL22LF0038 · ₱88,499,535.26 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY TAGUGPO - ILANGAY RIVER, LUPON, DAVAO ORIENTAL23LG0047 · ₱84,120,015.00 · mapped
- ROAD WIDENING (2 INTO 4 LANES) ALONG COMPOSTELA-CATEEL ROAD (DAVAO OR. SIDE) INCL. RROW, K1566+865 TO 1567+160, K1567+292 TO 1568+464, K1568+971 TO 1569+68318LF0021 · ₱75,413,506.22 · mapped
- BENIGNO S. AQUINO JR. NATIONAL HIGHWAY-K1575+400-K1575+700, CATEEL, DAVAO ORIENTAL25LF0053 · ₱74,157,339.09 · mapped
- ROAD WIDENING ( 2 INOT 4 LANES) ALONG SURIGAO DEL SUR BDRY.- DAVAO ORIENTAL COASTAL ROAD INCLUDING RROW K1547+680 TO K1551+24018LF0012 · ₱73,795,390.60 · mapped
- CONC. OF BRGY. PROPER TO SITIO MANTAPAY,BINONDO (WITH COCONET SLOPE PROTECTION),BAGANGA,DAVAO ORIENT15L00101 · ₱73,122,027.51
- CONSTRUCTION OF SUMLOG PARALLEL BRIDGE (SUBSTRUCTURE ONLY) ALONG PRES. DIOSDADO P. MACAPAGAL NATL HI-WAY, DAVAO ORIENTAL20L00174 · ₱72,375,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SITIO LOGDECK, MARAGATAS, LUPON, DAVAO ORIENTAL24LG0018 · ₱71,246,030.28 · mapped
- CONSTRUCTION OF BAGANGA COASTAL PROTECTION, BAGANGA, DAVAO ORIENTAL21LF0019 · ₱67,549,999.02 · mapped
Equipment & capacity
PCAB license
- License no.
- 14466
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Nov 6, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 14466); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 3 GPPB CPES releases; average final rating 92.6% over 1 rated project; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 9, 2025 | DPWH | ₱14,540,568.00 | On-going | 94.7% | — | 40th, p. 199 |
| Jun 8, 2025 | DPWH | ₱27,230,399.00 | On-going | 82.2% | — | 40th, p. 199 |
| Jul 28, 2024 | DPWH | ₱71,246,030.00 | On-going | 94.5% | — | 38th, p. 156 |
| Jun 21, 2023 | DPWH | ₱94,841,483.00 | On-going | 95.5% | — | 36th, p. 131 |
| Mar 3, 2020 | DPWH (JV) | ₱46,550,019.00 | Completed | 97.5% | 92.6% | 40th, p. 199 |
| Nov 18, 2019 | DPWH | ₱45,363,123.00 | On-going | 89.3% | — | 40th, p. 199 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →