JAGONBUILD CONST CORP FOR JAGON BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 277 linked DPWH project(s) totaling about ₱6,588,965,439.21. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
JAGONBUILD CONST CORP FOR JAGON BUILDERS
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 277
- Total value
- ₱6,588,965,439.21
- Published flags
- 11
- Region
- Metro Manila 3rd DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for JAGONBUILD CONST CORP FOR JAGON BUILDERS — not an accusation or finding of wrongdoing.
Score: 79.90 / 100 · Projects in sample: 277 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 58.6/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 58.6
- lateCompletedProjects
- 73
- onTimeCompletedProjects
- 151
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 272
- pastTargetOngoingProjects
- 48
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 277
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 277
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.1/100 · Weight: 11%
- projects
- 277
- componentScore
- 99.1
- flagsPerProject
- 0.03
- publishedV2Flags
- 8
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 277
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 269 geotagged projects (largest by contract value) — Open full map
- Construction of Riverbank Protection Structure at Barangay Catulinan, Baliuag, Bulacan24CC0046 · ₱98,999,220.54 · mapped
- Construction of Flood Control Structures along Bulo River Sta. 25+090 - Sta. 25+980, San Miguel Bulacan22CD0157 · ₱96,495,644.65 · mapped
- Rehabilitation of Existing Dike along Parua River (Talimundoc-Marimla Section, Right Bank), Package A, Concepcion, Tarlac24CK0080 · ₱96,494,656.20 · mapped
- Construction of Retarding Basin at Estero de Maypajo (Phase IV), Tondo, Manila City24OE0016 · ₱96,447,990.71 · mapped
- INTERJURISDICTIONAL ROADS AND/OR BRIDGES STA. MARIA-PANDI BYPASS ROAD, STA. MARIA SECTION, BULACAN22CD0170 · ₱95,038,187.07 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA25OC0015 · ₱92,157,064.71 · mapped
- IMPROVEMENT OF ROAD OF PANTALEON STREET (CONORADO STREET TO EDSA), MANDALUYONG CITY23OB0013 · ₱87,530,137.39 · mapped
- Construction of Flood Control Structure along Angat River, Sta. 12+340-Sta. 12+740, Angat, Bulacan23CD0061 · ₱86,848,966.84 · mapped
- Construction of Flood Control Wall along the Banks of Creeks in Barangay 179, Caloocan City24OD0036 · ₱84,637,889.92 · mapped
- Construction of Reinforced Concrete Flood Control Structure, Barangay Cambaog (Sitio Teodoro to Purok 4), Bustos, Bulacan24CC0274 · ₱77,199,050.27 · mapped
- Construction of Reinforced Concrete Flood Control Structure, Barangay Frances (Purok 4 to Purok 5), Calumpit, Bulacan24CC0190 · ₱77,187,426.47 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY PIEL (PUROK 6), BALIUAG, BULACAN25CC0065 · ₱74,134,879.41 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY PIEL (PUROK 6), BALIUAG, BULACAN25CC0064 · ₱74,111,983.33 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG NALAGTAS RIVER SAN JUAN SECTION BALAGTAS, BULACAN STA 012+640 TO STA. 012+79023CC0538 · ₱72,374,518.28 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER SAN JUAN SECTION BALAGTAS, BULACAN STA. 012+850 TO STA. 013+00023CC0570 · ₱72,374,244.73 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE II), LA PAZ, TARLAC25CK0014 · ₱72,362,392.67 · mapped
- INTERJURISDICTIONAL ROAD STA. MARIA-PANDI BYPASS ROAD, PANDI SECTION, BULACAN22CC0231 · ₱71,199,994.55 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG BARANGAY 179, CALOOCAN CITY25OD0312 · ₱69,088,271.53 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG BARANGAY 178, CALOOCAN CITY25OD0369 · ₱69,042,589.38 · mapped
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BALIUAG DIVERSION ROAD, BALIUAG, BULACAN25CC0508 · ₱65,050,801.78
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - BALIUAG DIVERSION ROAD, BALIUAG, BULACAN23CC0594 · ₱63,840,321.99
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS MH DEL PILAR ST. (MANILA), VALENZUELA CITY18OD0156 · ₱62,139,773.74 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAGAD, PASIG CITY24OB0128 · ₱58,206,140.77 · mapped
- CONSTRUCTION/ REHABILITATION OF RIVERWALL ALONG TULLAHAN RIVER, STA. 7+502 TO STA. 7+681, BRGY. MARULAS, VALENZUELA CITY19OD0186 · ₱57,834,032.30 · mapped
- CONSTRUCTION OF RIVERWALL TANZA PABAHAY NAVOTAS CITY21OA0031 · ₱57,812,147.64 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS IN BARANGAY 179 (PHASE 3), CALOOCAN CITY25OD0061 · ₱56,625,669.89 · mapped
- REHABILITATION OF BALANGKAS PUMPING STATION AND ADDITIONAL UNIT PUMP AND RECONSTRUCTION OF PUMP HOUSE AT BARANGAY BALANGKAS, VALENZUELA CITY25OD0221 · ₱56,350,608.97 · mapped
- Construction of Riverwall (Phase 2), Barangay Dampalit, Malabon City22OA0047 · ₱49,500,000.00 · mapped
- Construction of Riverwall along Tanza Dike (Phase 2), Barangay Tanza 1, Navotas City22OA0051 · ₱49,497,745.13 · mapped
- Construction of Flood Control Structure along Manila Bay, Barangay San Rafael IV, Noveleta, Cavite22DF0052 · ₱49,000,000.00 · mapped
- Construction of Riverwall and Road Dike along Batasan River (Phase 11), Brgy. Dampalit, Malabon City22OA0005 · ₱49,000,000.00 · mapped
- Construction of Box-Culvert Drainage along Sanciangco St. (P. Aquino St. To Catmon Bridge), Malabon City22OA0048 · ₱49,000,000.00 · mapped
- Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 5), Barangay Muzon, Malabon City24OA0038 · ₱49,000,000.00 · mapped
- Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 3)23OA0013 · ₱49,000,000.00 · mapped
- Construction of Riverwall along Tanza Dike (Phase 3), Barangay Tanza, Navotas City24OA0016 · ₱48,999,818.48 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM ALONG M.H. DEL PILAR ST. (PHASE 1), MALABON CITY24OA0048 · ₱48,998,685.11 · mapped
- Construction of Flood Control Structures and Improvement of Waterways along Barangay Panducot, Calumpit, Bulacan23CC0176 · ₱48,995,370.37 · mapped
- CONSTRUCTION OF STA. MARIA-PANDI BYPASS ROAD, PHASE II, STA, MARIA SECTION, BULACAN23CD0141 · ₱48,963,229.18 · mapped
- CONSTRUCTION OF SANTA MARIA-PANDI BYPASS ROAD (PHASE III), SANTA MARIA SECTION, BULACAN24CD0279 · ₱48,949,501.06 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PARUA RIVER, BARANGAY SAN VICENTE SECTION, PHASE 1, CONCEPCION, TARLAC24CK0194 · ₱48,245,557.36 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY25OD0110 · ₱48,240,283.41 · mapped
- CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY25OD0154 · ₱48,116,911.29 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE, MALARIA ROAD TO VICTORIA WAVE SPECIAL ECONOMIC ZONE, CALOOCAN CITY24OD0128 · ₱48,093,161.57 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG NANAY NANAYAN CREEK, BARANGAY 176, CALOOCAN CITY25OD0026 · ₱48,091,905.48 · mapped
- Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+223, Caloocan City23OD0214 · ₱47,813,558.33 · mapped
- CONSTRUCTION OF BRIDGE, STA. MARIA-PANDI BYPASS ROAD, STA. MARIA SECTION, BULACAN (PHASE 3)24CD0280 · ₱47,524,472.42 · mapped
- REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG MARALA RIVER (PHASE 1), NAVOTAS CITY25OA0051 · ₱47,512,238.85 · mapped
- REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SOUTH PINAGKABALIAN RIVER (PHASE 3), MALABON CITY25OA0043 · ₱47,511,212.13 · mapped
- CONSTRUCTION OF BYPASS/ALTERNATE/DIVERSION ROAD- BALIUAG DIVERSION ROAD IN BALIUAG, BULACAN (PHASE 1)24CC0564 · ₱47,039,952.93
- CONSTRUCTION OF BYPASS/ALTERNATE/DIVERSION ROAD- BALIUAG DIVERSION ROAD IN BALIUAG, BULACAN (PHASE 2)24CC0565 · ₱47,039,674.81
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
