Flood Control and Drainage18PA0110

RECHANNELING/DREDGING OF UDANGAN RIVER, LA PAZ, ABRA

RECHANNELING/DREDGING OF UDANGAN RIVER, LA PAZ, ABRA is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱48,007,879.77. Status: Reported complete (DPWH). Contractor on record: PHESCO INC 145. Figures trace to dpwh.

Abra DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱49,199 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-B-18-0008433 · ₱20,462 · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18PA0110 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-23 → 2025-06-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Abra

Based on the coordinates published with the DPWH record and NOAH file Abra.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RECHANNELING/DREDGING OF UDANGAN RIVER, LA PAZ, ABRA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱49,199,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Abra River, Sta. 0+000 - Sta. 1+290, Poblacion, La Paz, Abra
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-18-0008433

₱20,462.00 · FY2018

Released to Regional Office - I (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

342 projects · ₱29.0B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES SOOT BRIDGE (B00989LZ) ALONG ABRA - ILOCOS NORTE ROAD

Cordillera Administrative Region, Cordillera Administrative Region

2020₱530.8M
Reported complete (DPWH)
No sat.

CLUSTER: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS GOV. BADO DANGWA NATIONAL ROAD (1) K0342 +

Cordillera Administrative Region, Cordillera Administrative Region

2021₱492.1M
Reported complete (DPWH)
No sat.

ROCKFALL NETTING INCLUDING IMPROVEMENT OF CRITICAL INTERSECTION AT JCT. SHRINE HILLS ALONG DAVAO CITY DIVERSION ROAD, MATINA CROSSING, DAVAO CITY

Region XI, Region XI

2021₱333.7M
Reported complete (DPWH)
No sat.

MT PROV - CAGAYAN VIA TABUK - ENRILE RD, K0406+453 - KO406+692SADANGA, MT. PROVINCE

Cordillera Administrative Region, Cordillera Administrative Region

2022₱289.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONG. ANDRES ACOP COSALAN RD, KO301+(-905) - KO304+024, KO313+175 - KO317+533, KO319+000 - KO322+600, KO324+0

Cordillera Administrative Region, Cordillera Administrative Region

2022₱289.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS BENGUET - NUEVA VIZCAYA ROADKO254+(-372) - KO281+800BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2021₱289.5M
Reported complete (DPWH)
View all 342 projects →

4. Implementation

Contract Amount

₱48,007,879.77

Progress

Reported complete (DPWH)

Start Date

April 19, 2018

Target End

October 9, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “RECHANNELING/DREDGING OF UDANGAN RIVER, LA PAZ, ABRA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/09763052-7371-4fbf-881b-f649726aef07

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)AbraLa PazMudeng
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.