Construction of Flood Control Project in Curing River, Orani, Bataan
Construction of Flood Control Project in Curing River, Orani, Bataan is a DPWH-tracked public work in ORANI (BATAAN), BATAAN, Region III. Reported contract value: ₱48,509,999.16. Status: Reported complete (DPWH). Contractor on record: ROCKSTEEL CONST AND DEV'T CORP / EGB CONST CORP FORMERLY: EGB CONST. Figures trace to sumbong.
Total Contract Cost


