Flood Control and Drainage21OA0061

CONSTRUCTION OF PUMPING STATION BAGUMBAYAN SOUTH, NAVOTAS CITY

CONSTRUCTION OF PUMPING STATION BAGUMBAYAN SOUTH, NAVOTAS CITY is a DPWH-tracked public work in Malabon-Navotas DEO, National Capital Region. Reported contract value: ₱19,340,958.18. Status: Reported complete (DPWH). Contractor on record: CHRIZMARIE BUILDERS AND CONST SUPPLY. Figures trace to dpwh.

Malabon-Navotas DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱47,500 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-21-0001035 · ₱10,493,400 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱19,010,789 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-03 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Pumping station, cost per station (new construction)

₱19,340,958 per station= 0.5x the National Capital Region median (n=119)

Contract cost ₱19,340,958 ÷ 1 station read from the DPWH title (“PUMPING STATION”; single new pumping station named in title). National percentile: 17. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · NCR, Third District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF PUMPING STATION BAGUMBAYAN SOUTH, NAVOTAS CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱47,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures (Riverwall/Road Dike) Phase 12, Barangay Dampalit, Malabon City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-21-0001035

₱10,493,400.00 · FY2021

Released to Anti-Money Laundering Council (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21OA0061

₱19,010,789.20 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY

Award / contract ref: 21OA0061

Contractor

C

71 projects · ₱1.9B total · 0 flags

Other projects by this contractor

No sat.

CLUSTER 15: 1. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BASEY - MAYDOLONG, EASTERN SAMAR; 2. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LE

Region VIII, Region VIII

2023₱247.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SITIO KALAWIT - BARANGAY CADIAN, ORAS, EATERN SAMAR

Region VIII, Region VIII

2024₱168.8M
Past target date (DPWH On-Going)
No sat.

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MAYDOLONG - BASEY ROAD, EASTERN SAMAR

Region VIII, Region VIII

2025₱158.1M
Past target date (DPWH On-Going)
No sat.

ROAD WIDENING SECONDARY ROADS JCT. BUENAVISTA - LAWAAN - MARABUT RD (S00147SM), K0954+622 - K0955+000, K0955+700 - K0957+600, K0959+594 - K0960+624

Eastern Samar DEO, Region VIII

2025₱133.7M
Past target date (DPWH On-Going)
No sat.

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD PHASE II, BRGY. LUMATOD - DANAO, TAFT, EASTERN SAMAR

Region VIII, Region VIII

2024₱96.4M
Past target date (DPWH On-Going)
No sat.

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD PHASE II, BRGY. POLANGI - GAYAM, TAFT, EASTERN SAMAR LD

Region VIII, Region VIII

2024₱96.4M
Past target date (DPWH On-Going)
View all 71 projects →

4. Implementation

Contract Amount

₱19,340,958.18

Progress

Reported complete (DPWH)

Start Date

November 11, 2021

Target End

June 8, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of NavotasBagumbayan South
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.