Construction of Flood Control Structure along Sta. Maria River at barangay Poblacion to barangay Bagbaguin, Sta. Maria, Bulacan
Construction of Flood Control Structure along Sta. Maria River at barangay Poblacion to barangay Bagbaguin, Sta. Maria, Bulacan is a DPWH-tracked public work in SANTA MARIA (BULACAN), BULACAN, Region III. Reported contract value: ₱86,843,630.91. Status: Reported complete (DPWH). Contractor on record: HALREY CONST INC. Figures trace to sumbong.
Total Contract Cost


