Flood Control and Drainage25GD0002

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF CADIO FLOOD CONTROL STRUCTURES ALONG PANAY RIVER, BARANGAY CADIO, PANITAN, CAPIZ

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF CADIO FLOOD CONTROL STRUCTURES ALONG PANAY RIVER, BARANGAY CADIO, PANITAN, CAPIZ is a DPWH-tracked public work in Capiz 1st DEO, Region VI. Reported contract value: ₱57,187,830.00. Status: Past target date (DPWH On-Going). Contractor on record: SALMEGA BUILDERS. Figures trace to dpwh.

Capiz 1st DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROV-25-0005962 · ₱11,639,038 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25GD0002 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    89% reported · imagery 2016-03-17 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Capiz

Based on the coordinates published with the DPWH record and NOAH file Capiz.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF CADIO FLOOD CONTROL STRUCTURES ALONG PANAY RIVER, BARANGAY CADIO, PANITAN, CAPIZ

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Facilities (Sea Wall) along Visayan Sea, Barangay Punta Cogon, Roxas City, Capiz
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-25-0005962

₱11,639,038.00 · FY2025

Released to Capiz 1st DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

67 projects · ₱836.7M total · 0 flags

4. Implementation

Contract Amount

₱57,187,830.00

Progress

Past target date (DPWH On-Going)

Start Date

March 17, 2025

Target End

January 25, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)CapizPanitanCadio
Storms whose wind field reached it
Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.