Flood Control and Drainage24HN0111

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TINGUB CREEK, BRGY. PAGSABUNGAN, MANDAUE CITY, CEBU

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TINGUB CREEK, BRGY. PAGSABUNGAN, MANDAUE CITY, CEBU is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱48,969,680.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-24-0011737 · ₱57,620,507 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24HN0111 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-06-03 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cebu

Based on the coordinates published with the DPWH record and NOAH file Cebu.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TINGUB CREEK, BRGY. PAGSABUNGAN, MANDAUE CITY, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Tingub Creek, Brgy. Pagsabungan, Mandaue City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-24-0011737

₱57,620,507.20 · FY2024

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

41 projects · ₱1.6B total · 1 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, PHASE 3, BARANGAY S

Cebu 6th DEO, Region VII

2025₱122.4M
Past target date (DPWH On-Going)
No sat.

CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD UNDER CANSAGA BAY BRIDGE (MANDAUE SIDE) BRGY. P

Cebu 6th DEO, Region VII

2023₱98.9M
Reported complete (DPWH)

002: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE IV), MANDAUE CITY, CEBU

Cebu 6th DEO, Region VII

2024₱96.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SEGMENT 2, BARANGAY HILAAN, BONTOC, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2025₱96.5M
Past target date (DPWH On-Going)
No sat.

SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY JAGOBIAO, MANDAUE CITY, CEBU

Cebu 6th DEO, Region VII

2025₱77.1M
Past target date (DPWH On-Going)
No sat.

Construction of Flood Control Structure along Butuanon River (Downstream) Outfall, Barangay Pakna-an, Mandaue City, Cebu

MANDAUE CITY (CEBU), CEBU, Region VII

2025₱72.3M
Reported complete (DPWH)
View all 41 projects →

4. Implementation

Contract Amount

₱48,969,680.00

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

March 27, 2024

Target End

March 14, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of MandauePagsabungan
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.