Construction of Flood Control Structure along Orani River (Phase III), Orani, Bataan
Construction of Flood Control Structure along Orani River (Phase III), Orani, Bataan is a DPWH-tracked public work in ORANI (BATAAN), BATAAN, Region III. Reported contract value: ₱47,039,999.94. Status: Reported complete (DPWH). Contractor on record: PASCAL CONST. Figures trace to sumbong.
Total Contract Cost

