Flood Control and Drainage22AJ0065

CONSTRUCTION OF SLOPE PROTECTION ALONG BARANGAY LEET, STA. BARBARA, PANGASINAN (PHASE III)

CONSTRUCTION OF SLOPE PROTECTION ALONG BARANGAY LEET, STA. BARBARA, PANGASINAN (PHASE III) is a DPWH-tracked public work in Pangasinan 4th DEO, Region I. Reported contract value: ₱6,763,666.77. Status: Reported complete (DPWH). Contractor on record: KENWOOD CONST ENT CORP FORMERLY:KENWOOD CONST ENT. Figures trace to dpwh.

Pangasinan 4th DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-22-0009167 · ₱885,480 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱6,763,671

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-03 → 2025-02-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Pangasinan

Based on the coordinates published with the DPWH record and NOAH file Pangasinan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SLOPE PROTECTION ALONG BARANGAY LEET, STA. BARBARA, PANGASINAN (PHASE III)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bued River, Barangay Amagbagan-Tara-Tara, Sison, Pangasinan (Package 1)
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-22-0009167

₱885,480.00 · FY2022

Released to Southern Philippines Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22AJ0065

₱6,763,671.08 · Awardee from PhilGEPS

Award / contract ref: 22AJ0065

4. Implementation

Contract Amount

₱6,763,666.77

Progress

Reported complete (DPWH)

Start Date

March 24, 2022

Target End

June 14, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanSanta BarbaraLeet
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.