Flood Control and Drainage24OF0303

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B)

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B) is a DPWH-tracked public work in Quezon City 1st DEO, National Capital Region. Reported contract value: ₱47,766,141.50. Status: Past target date (DPWH On-Going). Contractor on record: FRAMECON BUILDERS. Figures trace to dpwh.

Quezon City 1st DEO, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-24-0006497 · ₱625,517 · release to the district office, not itemized per project

    Possible match · score 0.57

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱47,766,142 · FRAMECON BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    26% reported · imagery 2023-12-04 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · NCR, Second District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Barangay San Bartolome, Quezon City ( Phase II )
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-24-0006497

₱625,517.00 · FY2024

Released to Visayas State University (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24OF0303 (RE-BID FROM ID NO. 23OF0187) - CONSTRUCT

₱47,766,141.50 · FRAMECON BUILDERS

Contractor

B

495 projects · ₱7.8B total · 4 flags

4. Implementation

Contract Amount

₱47,766,141.50

Progress

Past target date (DPWH On-Going)

Start Date

February 20, 2025

Target End

December 16, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)Quezon CitySan Bartolome
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.