Construction of Flood Control Project along Orani River, Orani, Bataan (Phase III-A1)
Construction of Flood Control Project along Orani River, Orani, Bataan (Phase III-A1) is a DPWH-tracked public work in ORANI (BATAAN), BATAAN, Region III. Reported contract value: ₱9,899,999.99. Status: Reported complete (DPWH). Contractor on record: SAN SEBASTIAN CONST. Figures trace to sumbong.
Total Contract Cost

