Flood Control and Drainage18EI0051

CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN AQUILINO RIVER CONTROL STRUCTURE, ROXAS, ORIENTAL MINDORO

CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN AQUILINO RIVER CONTROL STRUCTURE, ROXAS, ORIENTAL MINDORO is a DPWH-tracked public work in Southern Mindoro DEO, Region IV-B. Reported contract value: ₱48,996,877.35. Status: Reported complete (DPWH). Contractor on record: SIXTEEN ENT-CALAPAN BRANCH. Figures trace to dpwh.

Southern Mindoro DEO, Region IV-B
Region: Region IV-B

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱50,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-18-0012182 · ₱40,000 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱47,382,831 · SIXTEEN ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-07-18 → 2023-12-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Oriental Mindoro

Based on the coordinates published with the DPWH record and NOAH file OrientalMindoro.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN AQUILINO RIVER CONTROL STRUCTURE, ROXAS, ORIENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of San Mariano River Control Structure, Roxas, Oriental Mindoro
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-18-0012182

₱40,000.00 · FY2018

Released to Regional Office - IVA (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of San Aquilino River Control Structu

₱47,382,830.96 · SIXTEEN ENTERPRISES

Award / contract ref: 18EI0051

Contractor

A

76 projects · ₱2.7B total · 0 flags

Other projects by this contractor

No sat.

ROAD WIDENING OF CALAPAN SOUTH ROAD, KO064+(-780)-KO064+(-320); KO064+(-200)-KO064+328; KO064+456-KO064+638; KO064+822-KO066+680; KO066+868-KO069+053; KO069+356-KO071+160; KO071+273-KO072+128; KO072+241-KO072+445; KO072+628-KO073+687; KO073+794-KO074+640,

Region IV-B, Region IV-B

2018₱204.4M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM- CONST. OF MISSING LINKS/NEW ROADS- BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), ORIENTAL MINDORO

Region IV-B, Region IV-B

2023₱135.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/NEW ROADS BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), STA. 0+000-STA. 0+044.60; STA. 0+105.40-STA. 1+302; STA. 0+066.60-STA. 0+105.40, ORIENTAL MINDORO

Region IV-B, Region IV-B

2021₱96.5M
Reported complete (DPWH)
No sat.

ROAD WIDENING OF SECONDARY ROADS, CSR (K0094+160 - K0094+191, K0094+200 - K0096+968), BANSUD, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱96.4M
Reported complete (DPWH)
No sat.

WIDENING OF CALAPAN SOUTH ROAD, SECT. 1-KO085+938-KO086+336; SECT. 2-KO086+657-KO086+846; SECT. 3-KO086+887-KO087+364; SECT. 4-KO087+861-KO088+690; SECT. 5-KO089+171-KO089+764; SECT. 6-KO090+287-KO090+390; SECT. 7-KO090+803-KO091+127; SECT. 8-KO091+578-KO

Southern Mindoro DEO, Region IV-B

2017₱93.6M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CALAPAN SOUTH ROAD, K0103+632 - K0104+224, K0124+976 - K0126+000, K0127+000 - K0127+400, K0127+560 - K0130+000), BONGABONG, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱92.4M
Reported complete (DPWH)
View all 76 projects →

4. Implementation

Contract Amount

₱48,996,877.35

Progress

Reported complete (DPWH)

Start Date

March 11, 2018

Target End

March 30, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOriental MindoroRoxasSan Aquilino
Storms whose wind field reached it
Koto 2025Fengshen 2025Bualoi 2025Prapiroon 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.