Flood Control and Drainage20CC0149

CONSTRUCTION OF FLOOD CONTROL STRUCTURES (REVETMENT) ALONG PLARIDEL RIVER, BRGY. PARULAN, STA. 14+263 TO STA. 14+330, PLARIDEL, BULACAN

CONSTRUCTION OF FLOOD CONTROL STRUCTURES (REVETMENT) ALONG PLARIDEL RIVER, BRGY. PARULAN, STA. 14+263 TO STA. 14+330, PLARIDEL, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱9,505,944.90. Status: Reported complete (DPWH). Contractor on record: M G FRANCISCO CONST. Figures trace to dpwh.

Bulacan 1st DEO, Region III
Region: Region III

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱10,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-20-0007526 · ₱1,558,081 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,505,945 · M. G. FRANCISCO CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-25 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱141,880 per linear m= 1.0x the Region III median (n=12)

Contract cost ₱9,505,945 ÷ 67 linear m read from the DPWH title (“STA. 14+263 TO STA. 14+330”; station range length (Sta. a+b to c+d)). National percentile: 55. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURES (REVETMENT) ALONG PLARIDEL RIVER, BRGY. PARULAN, STA. 14+263 TO STA. 14+330, PLARIDEL, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures (Revetment) along Paridel River, Brgy. Parulan, Plaridel, Bulacan Sta.14+263 to Sta. 14+330
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-20-0007526

₱1,558,081.00 · FY2020

Released to Muntinlupa Business High School (Pedro E. Diaz High School-Buli Annex) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Plaridel River, Brgy. Parulan, Sta. 14+263 to Sta.

₱9,505,944.90 · M. G. FRANCISCO CONSTRUCTION

Award / contract ref: 20CC0149

Contractor

A

81 projects · ₱1.2B total · 0 flags

4. Implementation

Contract Amount

₱9,505,944.90

Progress

Reported complete (DPWH)

Start Date

November 26, 2020

Target End

March 5, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanPlaridelParulan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.