CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL ALONG BANGCOLOTAN RIVER, (DOWNSTREAM B), ZAMBOANGUITA, NEGROS ORIENTAL
CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL ALONG BANGCOLOTAN RIVER, (DOWNSTREAM B), ZAMBOANGUITA, NEGROS ORIENTAL is a DPWH-tracked public work in Negros Oriental 3rd DEO, Negros Island Region. Reported contract value: ₱29,400,000.00. Status: Reported complete (DPWH). Contractor on record: KEILANA RESOURCE AND DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost

