Flood Control and Drainage25NF0051

CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY POBLACION, GENERAL LUNA, SURIGAO DEL NORTE

CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY POBLACION, GENERAL LUNA, SURIGAO DEL NORTE is a DPWH-tracked public work in Surigao del Norte 1st DEO, Region XIII. Reported contract value: ₱53,972,642.73. Status: Past target date (DPWH On-Going). Contractor on record: BOOMETRIX DEVELOPMENT CORP. Figures trace to dpwh.

Surigao del Norte 1st DEO, Region XIII
Region: Region XIII

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-D-25-0016891 · ₱1,680,345 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱53,972,643 · BOOMETRIX DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    19% reported · imagery 2024-07-05 → 2025-04-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Surigao del Norte

Based on the coordinates published with the DPWH record and NOAH file SurigaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY POBLACION, GENERAL LUNA, SURIGAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay Bayan, Marihatag, Surigao del Sur
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-D-25-0016891

₱1,680,345.00 · FY2025

Released to Regional Office - VIII (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25NF0051 CONSTRUCTION OF DRAINAGE STRUCTURE, BAR

₱53,972,642.73 · BOOMETRIX DEVELOPMENT CORP

Contractor

B

201 projects · ₱12.2B total · 1 flags

4. Implementation

Contract Amount

₱53,972,642.73

Progress

Past target date (DPWH On-Going)

Start Date

March 28, 2025

Target End

February 11, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del NorteGeneral LunaPoblacion V
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Ewiniar 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.