FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF SLOPE PROTECTION STRUCTURE ALONG BANABA BRIDGE, STA. 000+237.40-STA. 000+400, BUSUANGA, PALAWAN
FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF SLOPE PROTECTION STRUCTURE ALONG BANABA BRIDGE, STA. 000+237.40-STA. 000+400, BUSUANGA, PALAWAN is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱92,411,459.94. Status: Past target date (DPWH On-Going). Contractor on record: JASMIG CONST CORP FORMERLY: JASMIG CONST SUPPLY. Figures trace to dpwh.
Total Contract Cost

