Roads22CL0038

CONSTRUCTION OF STA. CRUZ- MANGATAREM ROAD, STA. CRUZ, ZAMBALES

CONSTRUCTION OF STA. CRUZ- MANGATAREM ROAD, STA. CRUZ, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱48,999,919.95. Status: Reported complete (DPWH). Contractor on record: EDFROBON CONST SERVICES INC. Figures trace to dpwh.

Zambales 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22CL0038 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-18 → 2025-04-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF STA. CRUZ- MANGATAREM ROAD, STA. CRUZ, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Guisguis - Mangatarem Bridge 1, Santa Cruz, Zambales
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Zambales 1st DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

19 projects · ₱1.6B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM-NATIONAL BLDG. PROGRAM-BLDGS, & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. OF BLDS. FOR VIROLOGY INSTITUTE OF SCIENCE AND TECHNOLOGY OF THE PHILS. (VIP), NEW CLARK CITY, CLARK FREEPORT & SPL. ECONOMIC ZONE (CFEZ), CAPAS, TARLAC

Region III, Region III

2023₱236.5M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-NATIONAL BLDG. PROGRAM-BLDGS. & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. OF BLDG. FOR VIROLOGY INSTITUTE OF SCIENCE AND TECH. OF THE PHILIPPINES (VIP), NEW CLARK CITY, CLARK FREEPORT AND SPECIAL ECONOMIC ZONE (CFEZ), CAPAS, TARLAC.

Region III, Region III

2022₱142.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPR'VT. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY-CONST. OF ARMY LEADERSHIP DEV'T. & EDUCATION CENTER (ALDEC) PHASE I-TRADOC MPB, TRADOC, PA, CAMP O'DONNEL, CAPAS, TARLAC, PROV. OF TARLAC

Region III, Region III

2020₱117.6M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION)-PACKAGE 5, PROVINCE OF PAMPANGA

Region III, Region III

2022₱99.4M
Reported complete (DPWH)

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BARANGAY SAN JUAN, SAN MIGUEL, BULACAN, PACKAGE I

Region III, Region III

2024₱96.5M
Reported complete (DPWH)

Rehabilitation of Flood Control Structure along Meycauayan River, Barangay Tawiran to Wawang Pulo, Sta. 02+356 - Sta. 02+496, Obando, Bulacan

OBANDO (BULACAN), BULACAN, Region III

2024₱96.5M
Reported complete (DPWH)
View all 19 projects →

4. Implementation

Contract Amount

₱48,999,919.95

Progress

Reported complete (DPWH)

Start Date

March 11, 2022

Target End

October 21, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF STA. CRUZ- MANGATAREM ROAD, STA. CRUZ, ZAMBALES.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/39bc79c4-f058-4911-b3de-63880b6c88e7

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesSanta CruzLomboy
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.