Flood Control and Drainage19GJ0219

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION/BANK IMPROVEMENT ALONG ILOILO RIVER, RIGHT BANK (FROM JALANDONI BRIDGE TO FORBES BRIDGE), (ESPLANADE 6), STA. 0+820 - STA. 1+660, ILOILO CITY

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION/BANK IMPROVEMENT ALONG ILOILO RIVER, RIGHT BANK (FROM JALANDONI BRIDGE TO FORBES BRIDGE), (ESPLANADE 6), STA. 0+820 - STA. 1+660, ILOILO CITY is a DPWH-tracked public work in Iloilo City DEO, Region VI. Reported contract value: ₱9,899,812.30. Status: Reported complete (DPWH). Contractor on record: VANNIE CONST AND SUPPLY FORMERLY: VANNIE. Figures trace to dpwh.

Iloilo City DEO, Region VI
Region: Region VI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-LGRCB-19-0003441 · ₱2,100,000 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,404,812 · VANNIE CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-09 → 2024-12-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Iloilo

Based on the coordinates published with the DPWH record and NOAH file Iloilo.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION/BANK IMPROVEMENT ALONG ILOILO RIVER, RIGHT BANK (FROM JALANDONI BRIDGE TO FORBES BRIDGE), (ESPLANADE 6), STA. 0+820 - STA. 1+660, ILOILO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-LGRCB-19-0003441

₱2,100,000.00 · FY2019

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Flood Mitigation Structure

₱9,404,812.30 · VANNIE CONSTRUCTION AND SUPPLY

Award / contract ref: 19GJ0219

Contractor

B

110 projects · ₱971.7M total · 0 flags

4. Implementation

Contract Amount

₱9,899,812.30

Progress

Reported complete (DPWH)

Start Date

August 19, 2019

Target End

January 2, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)City of IloiloInday
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.