Construction of Flood Control Structure, Barangay Banbancag, Bucay, Abra
Construction of Flood Control Structure, Barangay Banbancag, Bucay, Abra is a DPWH-tracked public work in BUCAY (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱28,998,220.94. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST / RM30 PSG CONST CORP. Figures trace to sumbong.
Total Contract Cost



