Construction of Bugbog-Santa Rosa Flood Control Structure (Phase 2), Barangay Bugbog to Barangay Santa Rosa, Bucay, Abra
Construction of Bugbog-Santa Rosa Flood Control Structure (Phase 2), Barangay Bugbog to Barangay Santa Rosa, Bucay, Abra is a DPWH-tracked public work in BUCAY (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱29,700,000.00. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST / RM30 PSG CONST CORP. Figures trace to sumbong.
Total Contract Cost


