Construction of Flood Control Dike along Linugos River (Upstream of Kibungsod Bridge), Magsaysay, Misamis Oriental (Phase 2)
Construction of Flood Control Dike along Linugos River (Upstream of Kibungsod Bridge), Magsaysay, Misamis Oriental (Phase 2) is a DPWH-tracked public work in MAGSAYSAY (LINUGOS) (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X. Reported contract value: ₱86,852,678.85. Status: Reported complete (DPWH). Contractor on record: RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE. Figures trace to sumbong.
Total Contract Cost



