Construction of Flood Control Structure along Meycauyan River, Sta 04+900 - Sta 05+100 (Liputan-Constantino Section, Right side), Meycauayan, Bulacan
Construction of Flood Control Structure along Meycauyan River, Sta 04+900 - Sta 05+100 (Liputan-Constantino Section, Right side), Meycauayan, Bulacan is a DPWH-tracked public work in CITY OF MEYCAUAYAN (BULACAN), BULACAN, Region III. Reported contract value: ₱96,499,747.83. Status: Reported complete (DPWH). Contractor on record: L R TIQUI BUILDERS INC / 729 CONST INC FORMERLY 722 CONST INC. Figures trace to sumbong.
Total Contract Cost





