Flood Control and Drainage18GO0111

CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM, PUROK SANTOL, BRGY. MANDALAGAN, BACOLOD CITY

CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM, PUROK SANTOL, BRGY. MANDALAGAN, BACOLOD CITY is a DPWH-tracked public work in Bacolod City DEO, Negros Island Region. Reported contract value: ₱1,440,431.04. Status: Reported complete (DPWH). Contractor on record: REDSON CONST AND SUPPLIES INC FORMERLY: REDSON CONST AND SUPPLIES. Figures trace to dpwh.

Bacolod City DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱40,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROVI-18-0002399 · ₱371,753 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,440,431 · REDSON CONSTRUCTION AND SUPPLIES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-02-12 → 2018-11-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Negros Occidental

Based on the coordinates published with the DPWH record and NOAH file NegrosOccidental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION  OF DRAINAGE SYSTEM, PUROK SANTOL, BRGY. MANDALAGAN, BACOLOD CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Revetment with Floodwall in Cabacawan River, Brgy. Villamonte, Bacolod City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVI-18-0002399

₱371,753.00 · FY2018

Released to Division of Aklan (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

18GO0111 -

₱1,440,431.04 · REDSON CONSTRUCTION AND SUPPLIES

Award / contract ref: 18GO0111

Contractor

A

180 projects · ₱2.5B total · 6 flags

4. Implementation

Contract Amount

₱1,440,431.04

Progress

Reported complete (DPWH)

Start Date

April 25, 2018

Target End

June 23, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)City of BacolodMandalagan
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.