Construction of Flood Control Structure along Pulo-Kabalutan River, Orani, Bataan
Construction of Flood Control Structure along Pulo-Kabalutan River, Orani, Bataan is a DPWH-tracked public work in ORANI (BATAAN), BATAAN, Region III. Reported contract value: ₱96,499,999.66. Status: Reported complete (DPWH). Contractor on record: PASCAL CONST. Figures trace to sumbong.
Total Contract Cost


