CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE DOWNSTREAM PORTION OF PORAC RIVER SOLIB SECTION, FLORIDABLANCA, PAMPANGA
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE DOWNSTREAM PORTION OF PORAC RIVER SOLIB SECTION, FLORIDABLANCA, PAMPANGA is a DPWH-tracked public work in Pampanga 2nd DEO, Region III. Reported contract value: ₱16,002,370.35. Status: Reported complete (DPWH). Contractor on record: TONKA CONST. Figures trace to dpwh.
Total Contract Cost


