Flood Control and Drainage17CN0136

CONSTRUCTION OF SERIES OF GROUNDSILL ALONG BAUL RIVER, BRGY. DINADIAWAN, DIPACULAO, AURORA

CONSTRUCTION OF SERIES OF GROUNDSILL ALONG BAUL RIVER, BRGY. DINADIAWAN, DIPACULAO, AURORA is a DPWH-tracked public work in Aurora DEO, Region III. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: CAVACON CORP FORMERLY CAGAYAN VALLEY CONST. Figures trace to dpwh.

Aurora DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-B-17-0006250 · ₱13,000,000 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17CN0136 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-11-17 → 2020-05-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Aurora

Based on the coordinates published with the DPWH record and NOAH file Aurora.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SERIES OF GROUNDSILL ALONG BAUL RIVER, BRGY. DINADIAWAN, DIPACULAO, AURORA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Diteki Flood Control, Maria Aurora, Aurora
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-17-0006250

₱13,000,000.00 · FY2017

Released to Philippine Sports Commission (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

56 projects · ₱4.2B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF BALER BYPASS ROAD, BALER, AURORA

Region III, Region III

2021₱263.0M
Reported complete (DPWH)
No sat.

WIDENING OF GENERAL SANTOS AVENUE, BRGY. LOWER BICUTAN TO BRGY. CENTRAL BICUTAN, TAGUIG CITY

National Capital Region, National Capital Region

2020₱232.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA

Region III, Region III

2022₱193.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS-CONCRETING OF ROAD FROM CASIGURAN TOWN PROPER LEADING TO CASAPSAPAN BAY & CASAPSAPAN TO DINIOG ROAD, PROVINCE OF AURO

Region III, Region III

2016₱193.0M
Reported complete (DPWH)
No sat.

CONVERGENCE ANS SPECIAL SUPPORT PROGRAM-BASIC INFRA PROGRAM-ACCESS ROADS AND/OR BRIDGES FR. THE NAT'L. ROAD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF DOÑA REMEDIOS TRINIDAD-DINGALAN ROAD, AURORA SECTION (PHASE 2), PROV. OF AURORA

Region III, Region III

2023₱192.3M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-CONSTRUCTION OF BALER BYPASS ROAD, BALER, AURORA

Region III, Region III

2023₱173.7M
Reported complete (100% progress, DPWH status On-Going)
View all 56 projects →

4. Implementation

Contract Amount

₱49,000,000.00

Progress

Reported complete (DPWH)

Start Date

August 14, 2017

Target End

August 27, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraDipaculaoDinadiawan
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Mitag 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.