Rehabilitation / Major Repair of Flood Control Structure21NE0037

Improvement of Cantujan River Navarro - Malinao River Basin, Brgy. Navarro, Tubajon, Dinagat Islands

Improvement of Cantujan River Navarro - Malinao River Basin, Brgy. Navarro, Tubajon, Dinagat Islands is a DPWH-tracked public work in DINAGAT ISLANDS, Region XIII. Reported contract value: ₱9,799,935.19. Status: Reported complete (DPWH). Contractor on record: LYCS BUILDERS AND TRADING. Figures trace to sumbong.

DINAGAT ISLANDS, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱10,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-21-0010312 · ₱100,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21NE0037 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-28 → 2024-10-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Dinagat Islands

Based on the coordinates published with the DPWH record and NOAH file DinagatIslands.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Improvement of Cantujan River Navarro - Malinao River Basin, Brgy. Navarro, Tubajon, Dinagat Islands

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Improvement of Wilson Flood Control Structure at Brgy. Wilson, San Jose, Dinagat Islands
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0010312

₱100,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0010257

₱20,000,000.00 · FY2021

DBM SARO listing (source)

3. Procurement & Award

Probable match · 86%

Construction project.Science Building

₱9,731,143.96 · LYCS BUILDERS AND TRADING

4. Implementation

Contract Amount

₱9,799,935.19

Progress

Reported complete (DPWH)

Start Date

March 16, 2021

Target End

July 24, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Dinagat IslandsTubajonNavarro
Storms whose wind field reached it
Penha 2026Nokaen 2026Koto 2025Kalmaegi 2025Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.