PACKAGE 9: A) ALUBBAGAN FLOOD CONTROL ALONG BIGA RIVER, BRGY. DUPLIGAN, TANUDAN B) BANNENG FLOOD CONTROL, TABUK
PACKAGE 9: A) ALUBBAGAN FLOOD CONTROL ALONG BIGA RIVER, BRGY. DUPLIGAN, TANUDAN B) BANNENG FLOOD CONTROL, TABUK is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱28,796,602.53. Status: Reported complete (DPWH). Contractor on record: YUNAKIM CONST. Figures trace to dpwh.
Total Contract Cost

