Construction of Flood Mitigation Structure24PK0014

Construction of Tabiong Flood Control along Chico River, Sta. 188+950 - Sta. 189+050 (LS), Poblacion, Tinglayan, Kalinga

Construction of Tabiong Flood Control along Chico River, Sta. 188+950 - Sta. 189+050 (LS), Poblacion, Tinglayan, Kalinga is a DPWH-tracked public work in TINGLAYAN (KALINGA), KALINGA, Cordillera Administrative Region. Reported contract value: ₱8,815,139.84. Status: Reported complete (DPWH). Contractor on record: MA BUYAGAN CONST SERVICES. Figures trace to sumbong.

TINGLAYAN (KALINGA), KALINGA, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱9,000

    Probable match · score 0.94

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-CAR-24-0019599 · ₱10,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24PK0014 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-08-10 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱88,151 per linear m= 1.2x the Cordillera Administrative Region median (n=212)

Contract cost ₱8,815,140 ÷ 100 linear m read from the DPWH title (“Sta. 188+950 - Sta. 189+050”; station range length (Sta. a+b to c+d)). National percentile: 31. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Kalinga

Based on the coordinates published with the DPWH record and NOAH file Kalinga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Tabiong Flood Control along Chico River, Sta. 188+950 - Sta. 189+050 (LS), Poblacion, Tinglayan, Kalinga

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 94%

UACS
18001
Amount
₱9,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Tabiong Flood Control along Chico River, Sta. 188 + 950 - Sta. 189 + 050 ( LS ) , Poblacion, Tinglayan, Kalinga
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-CAR-24-0019599

₱10,000,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-CAR-24-0008537

₱1,395,260.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-CAR-24-0005931

₱190,341.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-CAR-24-0008540

₱128,853.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

9 projects · ₱61.3M total · 0 flags

Other projects by this contractor

No sat.

Construction of Ngilin Flood Control along Chico River, Sta. 186+670 - Sta. 186+810 (R.S.), Ambato-Legleg, Tinglayan, Kalinga

TINGLAYAN (KALINGA), KALINGA, Cordillera Administrative Region

2024₱11.7M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF LOCAL ROAD, TINGLAYAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2023₱9.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG

Upper Kalinga DEO, Cordillera Administrative Region

2025₱7.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF CHALIYONG - KUB-AO FLOOD CONT

Upper Kalinga DEO, Cordillera Administrative Region

2024₱5.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES CONSTRUCTION OF ACCESS ROAD IN BARANGAY BASAO, TINGLAYAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2024₱4.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY BASAO, TINGLAYAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2025₱4.9M
Past target date (DPWH On-Going)
View all 9 projects →

4. Implementation

Contract Amount

₱8,815,139.84

Progress

Reported complete (DPWH)

Start Date

March 14, 2024

Target End

October 14, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaTinglayanLuplupa
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.