Flood Control and Drainage25AE0052

BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF CABAROAN - DALLANGAYAN CREEK SLOPE PROTECTION AT BRGY CABAROAN AND DALLANGAYAN, SAN FERNANDO, LA UNION (PHASE 2)

BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF CABAROAN - DALLANGAYAN CREEK SLOPE PROTECTION AT BRGY CABAROAN AND DALLANGAYAN, SAN FERNANDO, LA UNION (PHASE 2) is a DPWH-tracked public work in La Union 1st DEO, Region I. Reported contract value: ₱28,664,677.09. Status: Past target date (DPWH On-Going). Contractor on record: E E MADAYAG CONST. Figures trace to dpwh.

La Union 1st DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱28,664,677 · E. E. MADAYAG CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    59% reported · imagery 2025-01-02 → 2025-02-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · La Union

Based on the coordinates published with the DPWH record and NOAH file LaUnion.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF CABAROAN - DALLANGAYAN CREEK SLOPE PROTECTION AT BRGY CABAROAN AND DALLANGAYAN, SAN FERNANDO, LA UNION (PHASE 2)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure Dike, Barangay Caarusipan, San Juan, La Union
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

La Union 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25AE0052 CIVIL WORKS

₱28,664,677.09 · E. E. MADAYAG CONSTRUCTION

Contractor

B

431 projects · ₱3.8B total · 0 flags

4. Implementation

Contract Amount

₱28,664,677.09

Progress

Past target date (DPWH On-Going)

Start Date

May 26, 2025

Target End

December 23, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)La UnionCity of San FernandoCabaroan
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.