Flood Control and Drainage17OA0020

REHAB./IMPV'T. OF FLOOD CONTROL AND DRAINAGE STRUCTURES ALONG GOV. W. PASCUAL AVE., MALABON CITY

REHAB./IMPV'T. OF FLOOD CONTROL AND DRAINAGE STRUCTURES ALONG GOV. W. PASCUAL AVE., MALABON CITY is a DPWH-tracked public work in Malabon-Navotas DEO, National Capital Region. Reported contract value: ₱2,810,276.52. Status: Reported complete (DPWH). Contractor on record: TM ABAD CONST CORP FOR: TM ABAD CONST. Figures trace to dpwh.

Malabon-Navotas DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱3,047

    Probable match · score 0.96

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0022649 · ₱7,844 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17OA0020 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-01-13 → 2018-02-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHAB./IMPV'T. OF FLOOD CONTROL AND DRAINAGE STRUCTURES ALONG GOV. W. PASCUAL AVE., MALABON CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 96%

UACS
18001
Amount
₱3,047,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation/Improvement of Flood Control and Drainage Structures along Gov. W. Pascual Ave., Malabon City
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0022649

₱7,844.00 · FY2017

Released to Pablo Lorenzo National High School (Mandug National High School) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

326 projects · ₱3.4B total · 1 flags

4. Implementation

Contract Amount

₱2,810,276.52

Progress

Reported complete (DPWH)

Start Date

February 27, 2017

Target End

June 14, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.