Flood Control and Drainage19BB0089

LOCAL PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES -LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SEA WALL (PHASE I), BUGUEY, CAGAYAN

LOCAL PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES -LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SEA WALL (PHASE I), BUGUEY, CAGAYAN is a DPWH-tracked public work in Cagayan 1st DEO, Region II. Reported contract value: ₱48,888,812.86. Status: Reported complete (DPWH). Contractor on record: C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC. Figures trace to dpwh.

Cagayan 1st DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROXI-19-0018277 · ₱250,056 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱48,888,813

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-11 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cagayan

Based on the coordinates published with the DPWH record and NOAH file Cagayan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES -LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SEA WALL (PHASE I), BUGUEY, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-19-0018277

₱250,056.00 · FY2019

Released to School (Davao del Sur National High School) 0911230 - Digos City National High (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Local Program - Flood Control and Drainage - Flood

₱48,888,812.86 · Awardee from PhilGEPS

Award / contract ref: 19BB0089 (Re-advertised)

Contractor

B

87 projects · ₱3.2B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, ROMAN EXPRESSWAY, PROVINCE OF BATAAN

Region III, Region III

2019₱131.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF QUIMALABASA NORTE FLOOD CONTROL STRUCTURE SECTION 5,

Isabela 4th DEO, Region II

2025₱106.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA

Region II, Region II

2021₱104.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAUAYAN CITY BY-PASS ROAD, PACKAGE 1, ISABELA; STA. 000+000-STA. 001+085

Region II, Region II

2020₱103.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ), CORDON AND SANTIAGO, ISABELA

Region II, Region II

2020₱99.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: VILLA GAMIAO, SAN ANTONIO, DARAMUANGAN SUR AND SALINUNGAN EAST ROADS CONNECTING TO MUNGGO PROCESSING AND PACKAGING CENTER

Region II, Region II

2021₱97.8M
Reported complete (DPWH)
View all 87 projects →

4. Implementation

Contract Amount

₱48,888,812.86

Progress

Reported complete (DPWH)

Start Date

September 3, 2019

Target End

May 20, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanBugueyCentro
Storms whose wind field reached it
Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025Kajiki 2025
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.