Construction of Flood Mitigation Structure22HC0068

Construction of Seawall, Brgy Bonbon, Clarin, Bohol

Construction of Seawall, Brgy Bonbon, Clarin, Bohol is a DPWH-tracked public work in CLARIN (BOHOL), BOHOL, Region VII. Reported contract value: ₱13,900,320.00. Status: Reported complete (DPWH). Contractor on record: SLP CONST. Figures trace to sumbong.

CLARIN (BOHOL), BOHOL, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱35,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0002932 · ₱551,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22HC0068 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-09-15 → 2017-09-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Bohol

Based on the coordinates published with the DPWH record and NOAH file Bohol.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Seawall, Brgy Bonbon, Clarin, Bohol

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Capayas Flood Control, Ubay, Bohol
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002932

₱551,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0001731

₱3,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

92 projects · ₱943.8M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-CATIGBIAN-CANMANO ROAD(CATIGBIAN SECTION) LEADING TO SAGBAYAN PEAK, CHOCOLATE HILLS AND DANAO ADVENTURE PARK, CATIGBIAN, BOHOL

Bohol 1st DEO, Region VII

2018₱47.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS JCT (LIR) CARMEN-SAGBAYAN- BACANI RD- K0178+765 - K0178+804, SAGBAYAN, BOHOL

Bohol 2nd DEO, Region VII

2023₱31.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - LA PAZ (CORTES) - CABAGUAN - LOURDES - ANISLAG (CORELLA) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, CORTES, BOHOL

Bohol 1st DEO, Region VII

2022₱29.4M
Reported complete (DPWH)
No sat.

INSTALLATION OF ROAD SAFETY DEVICES (SOLAR PAVEMENT STUDS) - JCT. (TER) DAUIS-PANGLAO ROAD - K0003+(-776) - K0003+000 (S00020BH), K0003+000 - K0018+084

Bohol 1st DEO, Region VII

2022₱29.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM- CONSTRUCTION OF WATERWORKS SYSTEMS (LEVEL 3), BUENAVISTA, BOHOL

Bohol 2nd DEO, Region VII

2023₱28.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -REHABILITATION OF SAN ISIDRO- CATIGBIAN VI

Bohol 2nd DEO, Region VII

2022₱28.6M
Reported complete (DPWH)
View all 92 projects →

4. Implementation

Contract Amount

₱13,900,320.00

Progress

Reported complete (DPWH)

Start Date

February 8, 2022

Target End

September 10, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholClarinBonbon
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.