Flood Control and Drainage17OD0108

CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG TULLAHAN RIVER, BRGY. 164, STA. 1+161 - STA. 1+850, CALOOCAN CITY

CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG TULLAHAN RIVER, BRGY. 164, STA. 1+161 - STA. 1+850, CALOOCAN CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱22,299,185.68. Status: Reported complete (DPWH). Contractor on record: M G SALAZAR CONST CORP FOR M G SALAZAR. Figures trace to dpwh.

Metro Manila 3rd DEO, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱25,000

    Probable match · score 0.95

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0019987 · ₱15,125 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱22,299,186 · M.G. SALAZAR CONSTRUCTION .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-17 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱32,365 per linear m= 0.2x the National Capital Region median (n=45)

Contract cost ₱22,299,186 ÷ 689 linear m read from the DPWH title (“STA. 1+161 - STA. 1+850”; station range length (Sta. a+b to c+d)). National percentile: 5. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · NCR, Third District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG TULLAHAN RIVER, BRGY. 164, STA. 1+161 - STA. 1+850, CALOOCAN CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Riverwall along Tullahan River, Brgy. 164, Sta. 1+161 - Sta. 1+850, Caloocan City
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0019987

₱15,125.00 · FY2017

Released to Barcelona National Comprehensive High School Allot di pe (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17OD0108

₱22,299,185.68 · M.G. SALAZAR CONSTRUCTION .

Award / contract ref: 17OD0108

Contractor

B

222 projects · ₱9.0B total · 0 flags

Other projects by this contractor

View all 222 projects →

4. Implementation

Contract Amount

₱22,299,185.68

Progress

Reported complete (DPWH)

Start Date

June 6, 2017

Target End

November 2, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ValenzuelaUgong
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.