Construction of Flood Mitigation Structure23EB0020

Construction of Causeway with RORO Ramp and Trestle (Phase II), Sta. 0+000 - Sta. 0+251, Paluan, Occidental Mindoro

Construction of Causeway with RORO Ramp and Trestle (Phase II), Sta. 0+000 - Sta. 0+251, Paluan, Occidental Mindoro is a DPWH-tracked public work in PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO, Region IV-B. Reported contract value: ₱96,492,142.55. Status: Reported complete (DPWH). Contractor on record: F A TORRES CONST / C T LEONCIO CONST & TRADING. Figures trace to sumbong.

PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱46,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23EB0020 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-03-23 → 2024-11-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Causeway with RORO Ramp and Trestle (Phase II), Sta. 0+000 - Sta. 0+251, Paluan, Occidental Mindoro

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱46,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Patrick Flood Control (Kambingan Section), Sta. 0+000 - Sta. 0+433, Sablayan, Occidental Mindoro
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Mindoro Occidental District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

1 projects · ₱96.5M total · 0 flags

4. Implementation

Contract Amount

₱96,492,142.55

Progress

Reported complete (DPWH)

Start Date

May 2, 2023

Target End

April 23, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOccidental MindoroPaluan
Storms whose wind field reached it
Koto 2025Fengshen 2025Bualoi 2025Prapiroon 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.