Flood Control and Drainage20GA0018

CONST. OF REVETMENT WALL ALONG AKLAN RIVER, BRGY. BAKHAW NORTE, KALIBO, AKLAN

CONST. OF REVETMENT WALL ALONG AKLAN RIVER, BRGY. BAKHAW NORTE, KALIBO, AKLAN is a DPWH-tracked public work in Aklan DEO, Region VI. Reported contract value: ₱48,999,978.47. Status: Reported complete (DPWH). Contractor on record: CLIFFORD CONST CORP. Figures trace to dpwh.

Aklan DEO, Region VI
Region: Region VI

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱25,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱46,647,971 · CLIFFORD CONST CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-17 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Aklan

Based on the coordinates published with the DPWH record and NOAH file Aklan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF REVETMENT WALL ALONG AKLAN RIVER, BRGY. BAKHAW NORTE, KALIBO, AKLAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Aldan River, Brgy. Bakhaw Norte (Sitio Liboton), Kalibo, Aklan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Aklan DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

4. Implementation

Contract Amount

₱48,999,978.47

Progress

Reported complete (DPWH)

Start Date

February 14, 2020

Target End

December 8, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONST. OF REVETMENT WALL ALONG AKLAN RIVER, BRGY. BAKHAW NORTE, KALIBO, AKLAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/bc933cf4-9326-4f1b-90a9-f453b7fe3954

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)AklanKaliboBachaw Norte
Storms whose wind field reached it
Koto 2025Kalmaegi 2025Bualoi 2025Prapiroon 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.