Construction of Flood Mitigation Structure23EE0027

Construction of Bato Bridge Flood Control Structure, Taytay, Palawan

Construction of Bato Bridge Flood Control Structure, Taytay, Palawan is a DPWH-tracked public work in TAYTAY (PALAWAN), PALAWAN, Region IV-B. Reported contract value: ₱9,064,029.80. Status: Reported complete (DPWH). Contractor on record: MAC BUILDERS CIVIL ENGINEERING CONST. Figures trace to sumbong.

TAYTAY (PALAWAN), PALAWAN, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱9,250

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23EE0027 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-08-23 → 2018-08-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Palawan

Based on the coordinates published with the DPWH record and NOAH file Palawan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Bato Bridge Flood Control Structure, Taytay, Palawan

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱9,250,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bato Bridge Flood Control Structure, Taytay, Palawan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Palawan 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

108 projects · ₱653.6M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF SITIO CASTILLA, BRGY. STO. NINO FMR, BUSUANGA, PALAWAN

Palawan 1st DEO, Region IV-B

2024₱14.9M
Reported complete (DPWH)
No sat.

PACKAGE 3-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. LAJALA ELEMENTARY SCHOOL, BARANGAY LAJALA, CORON2. BIONG ELEMENTARY SCHOOL, BARANGAY OSMENA, CULION3. BALDAT ELEMENTARY SCHOOL, BARANGAY BALDAT, CULION

Palawan 1st DEO, Region IV-B

2024₱14.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BANAYBANAY I AND BANAYBANAY II, SAN JOSE, BAT

Batangas 4th DEO, Region IV-A

2024₱14.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD, BARANGAY CATANDALA, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CONCRETE ROAD, BARANGAY DAYAPAN, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

PACKAGE 1-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. BALOGO ELEMENTARY SCHOOL, BARANGAY BALOGO2. ARACELI NORTH CENTRAL SCHOOL, BARANGAY POBLACION, ARACELI, PALAWAN

Palawan 1st DEO, Region IV-B

2024₱9.9M
Past target date (DPWH On-Going)
View all 108 projects →

4. Implementation

Contract Amount

₱9,064,029.80

Progress

Reported complete (DPWH)

Start Date

March 15, 2023

Target End

August 28, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionPalawanTaytayBato
Storms whose wind field reached it
Koto 2025Kalmaegi 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.