Construction of Flood Mitigation Structure23CA0050

Construction of Flood Control Project along Catmon River, Abucay, Bataan (Phase III-AA)

Construction of Flood Control Project along Catmon River, Abucay, Bataan (Phase III-AA) is a DPWH-tracked public work in ABUCAY (BATAAN), BATAAN, Region III. Reported contract value: ₱9,899,964.83. Status: Reported complete (DPWH). Contractor on record: AS MACHA CONST AND TRADING. Figures trace to sumbong.

ABUCAY (BATAAN), BATAAN, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project along Catmon River, Abucay, Bataan (Phase III-AA)
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Bataan 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

129 projects · ₱905.9M total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG COLO RIVER (MAGUINDONG DAM SECTION), BRGY LUACAN, DINALUPIHAN, BATAAN

Bataan 3rd DEO, Region III

2025₱51.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NEW ROAD, CURING AVE. CONNECTING JCT. LAYAC-BALANGA-MARIVELES PORT RD AND ROMAN EXPRESSWAY, ORANI

Bataan 1st DEO, Region III

2024₱29.7M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG PENTOR-BALSIK-CAULAMAN RIVER, SAN SIMON SECTION, PHASE ERD- 1, DINALUPIHAN, BATAAN

Bataan 1st DEO, Region III

2022₱24.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONST OF ROAD, PABITON ST., BRGY GUGO,

Bataan 1st DEO, Region III

2025₱24.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE ANS SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER RA 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD - DINALUPIHA, BATAAN

Bataan 3rd DEO, Region III

2025₱23.2M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF BARANGAY BALUT-PUKSUAN ROAD, ORANI, BATAAN

Bataan 1st DEO, Region III

2024₱19.8M
Reported complete (DPWH)
View all 129 projects →

4. Implementation

Contract Amount

₱9,899,964.83

Progress

Reported complete (DPWH)

Start Date

July 10, 2023

Target End

December 9, 2023

5. Audit