Flood Control and Drainage25HB0019

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MGT. PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG TUMURAN-SARANGANI RIVER, CANDIJAY, BOHOL, SEC. 1

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MGT. PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG TUMURAN-SARANGANI RIVER, CANDIJAY, BOHOL, SEC. 1 is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱87,868,645.64. Status: Reported complete (DPWH). Contractor on record: MUANA CONST AND DEVELOPMENT CORP FORMERLY. Figures trace to dpwh.

Bohol 3rd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25HB0019 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2025-01-25 → 2026-03-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Bohol

Based on the coordinates published with the DPWH record and NOAH file Bohol.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MGT. PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG TUMURAN-SARANGANI RIVER, CANDIJAY, BOHOL, SEC. 1

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Protection Dike, Cahayag CIS, Tubigon, Bohol
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Bohol 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

261 projects · ₱5.3B total · 0 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCTURE ALONG GABAYAN RIVER, CANDIJAY, BOHOL, STA. 0+600.00 - STA. 1+068.00, S

Bohol 3rd DEO, Region VII

2025₱144.7M
Past target date (DPWH On-Going)

Construction of Tumuran - Sarangani River Control, Phase II, Candijay, Bohol

CANDIJAY (BOHOL), BOHOL, Region VII

2024₱144.6M
Reported complete (DPWH)
No sat.

CSSP, CONST./IMPROVEMENT OF VARIOUS INFRA IN SUPPORT OF NATIONAL SECURITY(TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAN AT SEGURIDAD PROGRAM-TIKAS), REHAB. OF 47TH INFANTRY (K) BATTALION HEADQUARTERS-CAMP RAJAH SIKATUNA (PHASE 1),BRGY.KATIPUNAN, CARMEN, BOHOL

Region VII, Region VII

2025₱141.9M
Past target date (DPWH On-Going)
No sat.

CSSP, CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAN AT SEGURIDAD PROGRAM-TIKAS), REHAB. OF 47TH INFANTRY (K) BATTALION HEADQUARTERS-CAMP RAJAH SIKATUNA (PHASE 2), BRGY. KATIPUNAN,

Region VII, Region VII

2025₱141.9M
Past target date (DPWH On-Going)

Construction of Wahig River Control Structure, Pamacsalan Area, Pilar, Bohol

PILAR (BOHOL), BOHOL, Region VII

2024₱130.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), BRGY. POBLACION, CANDIJAY, BOHOL

Bohol 3rd DEO, Region VII

2023₱99.0M
Reported complete (DPWH)
View all 261 projects →

4. Implementation

Contract Amount

₱87,868,645.64

Progress

Reported complete (DPWH)

Start Date

March 3, 2025

Target End

December 5, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholCandijayPoblacion
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.